RWP PG Exam Questions with Complete Solutions
RWP PG Exam Questions with Complete Solutions type of working limits on controlled track - Correct Answer foul time, exclusive track occupancy type of working limits on non-controlled track - Correct Answer inaccessible track type of train approach warning - Correct Answer watchman type of train approach warning - Correct Answer individual train detection What type of work roadway workers do? - Correct Answer inspection and construction of track, maintenance of bridges, repair of signal and communication systems, repair of RMM True or false. Fouling a track can apply to both people and machinery - Correct Answer True Within what distance to the track is a roadway worker considered fouling it? - Correct Answer 4 feet from the nearest running rail a what authorizes movements on controlled track. - Correct Answer Operator/Dispatcher The RWIC is required to be qualified on physical characteristics when their group is working on.... - Correct Answer All tracks The EIC is an employee who is in charge of.... - Correct Answer A work group The main role of the RWIC is.... - Correct Answer To establish on track safety
Written for
- Institution
- RWP
- Course
- RWP
Document information
- Uploaded on
- November 17, 2025
- Number of pages
- 7
- Written in
- 2025/2026
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
-
type of working limits on controlled track foul ti
-
type of working limits on non controlled track
-
type of train approach warning