WITH SOLUTIONS GRADED A+
◉ The entry teams responsibilities include which of the following
choices?
Monitoring air for I DL H conditions
Monitoring for ionization radiation
Visually checking for dangerous conditions
All of the above. Answer: All of the above
◉ The task of document control should be assigned to one individual on
the project team and should include which of the following
responsibilities?
Keeping a document record by job cycle
Collecting all documents at the end of each pay period
Making sure that all information is written in waterproofing
None of the above. Answer: Making sure that all information is written
in waterproofing
◉ Off-site information can be obtained by using which two methods?
Survey and on-going monitoring
, Interviews and perimeter reconnaissance
Analyzing water and soil samples from the site
None of the above. Answer: Interviews and perimeter reconnaissance
◉ The in ensamble of clothing and equipment referred to as level B
protection is generally the minimum level recommended for an initial
entry until what is found to be TRUE?
The site hazards have been further identified.
An ongoing air-monitoring program is recognized.
Interviews and research have been conducted.
Perimeter reconnaissance has been completed. Answer: The site hazards
have been further identified.
◉ Which of the following is a phase of the site characterization process?
Off-perimeter survey
On-site survey
Remote monitoring
Requested monitoring. Answer: On-site survey
◉ What information should be collected before any personalities
allowed to go on-site?
Geological and hydrological data
Description of activity at the site