Lineman Apprenticeship Exam UPDATED Study QUESTIONS AND CORRECT ANSWERS Blue hoist rated for - CORRECT ANSWER Green hoist - CORRECT ANSWER Single 2000 lbs. double 4000lbs Single 1500 lbs. double 3000 lbs Red tag - CORRECT ANSWER Clearance tag- is the personnel protective indication of individuals at work. A clearance tag is placed for the designated " clearance holder" at the open points where hazardous energizing could occur before a clearance work authorized has been issued. Orange tag - CORRECT ANSWER DO NOT operate tag denotes the operational status of a device. A switch or switch point (elbow,open jumpers) with a DO NOT operate tag attached shall NOT be operated under any circumstances! Yellow tag - CORRECT ANSWER Hot line tags are placed when the automatic reclosing features of a breaker or other device have been disabled. When "turned off" the breaker or other device , if tripped, will not close automatically.

Show more Read less
Institution
Apprentice Lineman
Course
Apprentice Lineman










Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
Apprentice Lineman
Course
Apprentice Lineman

Document information

Uploaded on
October 18, 2025
Number of pages
18
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

Lineman Apprenticeship Exam UPDATED
Study QUESTIONS AND CORRECT
ANSWERS
Blue hoist rated for - CORRECT ANSWER Single 2000 lbs. double 4000lbs



Green hoist - CORRECT ANSWER Single 1500 lbs. double 3000 lbs



Red tag - CORRECT ANSWER Clearance tag- is the personnel protective indication of
individuals at work. A clearance tag is placed for the designated " clearance holder" at the
open points where hazardous energizing could occur before a clearance work authorized has
been issued.



Orange tag - CORRECT ANSWER DO NOT operate tag denotes the operational status
of a device. A switch or switch point (elbow,open jumpers) with a DO NOT operate tag
attached shall NOT be operated under any circumstances!



Yellow tag - CORRECT ANSWER Hot line tags are placed when the automatic
reclosing features of a breaker or other device have been disabled. When "turned off" the
breaker or other device , if tripped, will not close automatically.



What does JHA stand for - CORRECT ANSWER Job Hazard Analysts



Wire colors for 120/208? - CORRECT ANSWER Black Red Blue



Wire color for 277/480? - CORRECT ANSWER (BOY) Brown orange yellow



Visual Wood rot on a pole - CORRECT ANSWER 1

3" hole
OR

,2

2" holes



What do you do if decay on a pole is suspected? - CORRECT ANSWER 1) Dig
completely around the pole to a depth of 18 inches.

2) Probe the pole with a probing tool to determine the poles condition



What class are our rubber gloves? - CORRECT ANSWER Class 2



What are our gloves tested & rated for? - CORRECT ANSWER Tested at 20KVA &
rated at 17 KVA



How often are our gloves changed? - CORRECT ANSWER Every 4 months



How often do you inspect your gloves? - CORRECT ANSWER Inspected daily and/or
at any time you feel they might have been damaged



What is the ring at the top of your glove called? - CORRECT ANSWER Corona ring.
It's purpose is to stop tracking



Work method 2.3? - CORRECT ANSWER Electrical saftey



What are #2 primary jumpers rated for? - CORRECT ANSWER 192 AMPS



What are 4/0 primary jumpers rated for? - CORRECT ANSWER 387 AMP



What size grounds do we have? - CORRECT ANSWER Overhead- 2/0

Underground- 1/0

, Do you need rubber gloves if you are using an extendo? - CORRECT ANSWER Only
if the extendo doesn't reach 20 feet



When is arc-rated FR face shields & arc flash suit required? - CORRECT ANSWER 1-
setting or removing a three phase self contained meter

2-checking voltage on a K-type meter

3-connecting or disconnecting underground parallel services
4-when working on any 480 Volt network underground system requires the temporary use of
100 cal/cm2 arc suit for specific task



What does an arc flash suit consist of? - CORRECT ANSWER Coveralls, full coverage
face shield, hoods with ventilation



Are you required to test each leg of a service prior to energizing or after lifting a secondary
leg to de-energize? - CORRECT ANSWER Yes, after energizing the first leg, all
subsequent legs must be tested for lack of voltage prior to energizing. When de-energizing a
line check the leg for lack of voltage.



What two things make up MAD? - CORRECT ANSWER 2" for electrical error

24" for human error



When is a pre-job needed? - CORRECT ANSWER Whenever hands on work is being
conducted



What does CSP stand for? - CORRECT ANSWER Completely Self Protective



What is a CSP? - CORRECT ANSWER A transformer with no cut out. It has two
levers on the side of the transformer. One is to opens and closes it. To open you push up, to
close you pull down



Round dye - CORRECT ANSWER Leave a space in between squeezes

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
STANFORDTOPGRADES Stanford University
Follow You need to be logged in order to follow users or courses
Sold
28
Member since
10 months
Number of followers
2
Documents
4916
Last sold
4 hours ago
TOPSELLER

Hi there! I'm dedicated to sharing my high-quality study guides and helpful EXAM Materials to make your learning easier and more efficient. All my materials are well-organized and tailored to help you ace your courses. I offer genuine and dependable exam papers that are directly obtained from well-known, reputable institutions as a highly regarded professional who specializes in sourcing study materials. Kindly don't hesitate to contact me, my study guides, notes and exams or test banks, are 100% graded and fully guaranteed

Read more Read less
4,7

3 reviews

5
2
4
1
3
0
2
0
1
0

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their exams and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can immediately select a different document that better matches what you need.

Pay how you prefer, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card or EFT and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions