During installation of traffic loops in the pavement, which three statements apply prior to and during the installation of loop wire? (Choose 3). a) Do not allow vehicular traffic over an open saw cut. b) Do not overlap saw cuts at the corner. c) Thoroughly clean the saw cut of foreign material. d) Use a plastic sleeve where loop wire crosses a joint. - Answer a) Do not allow vehicular traffic over an open saw cut. c) Thoroughly clean the saw cut of foreign material. d) Use a plastic sleeve where loop wire crosses a joint. The contractor is installing a culvert with a 12-inch reinforced concrete pipe ( outside diameter of 16.50 inches) from Sta 10+00, 40 feet Left to STA 10+00, 65 feet Right on 4-inch bedding material. The 12-inch RCP outlet is to be installed at Sta 10+00, 40 feet Left at an invert elevation of 652.50. If the conduit is installed at a 1.40% slope, what is the elevation of the foundation grade at Sta 10+00, 45 feet Right? a) 652.04 b) 653.17 c) 653.36 d) 653.50 - Answer ? On the reservoir side of a dam, erosion protection against wave action should extend up the slope to at least which level?

Show more Read less
Institution
NICET LEVEL 1 IN HIGHWAY CONSTRUCTION
Course
NICET LEVEL 1 IN HIGHWAY CONSTRUCTION









Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
NICET LEVEL 1 IN HIGHWAY CONSTRUCTION
Course
NICET LEVEL 1 IN HIGHWAY CONSTRUCTION

Document information

Uploaded on
September 18, 2025
Number of pages
14
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

NICET Highway Construction
Inspector Level III Practice Exam 1
Questions and Already Passed
Answers.
During installation of traffic loops in the pavement, which three statements apply prior to and
during the installation of loop wire? (Choose 3).



a) Do not allow vehicular traffic over an open saw cut.

b) Do not overlap saw cuts at the corner.

c) Thoroughly clean the saw cut of foreign material.

d) Use a plastic sleeve where loop wire crosses a joint. - Answer a) Do not allow vehicular
traffic over an open saw cut.

c) Thoroughly clean the saw cut of foreign material.

d) Use a plastic sleeve where loop wire crosses a joint.



The contractor is installing a culvert with a 12-inch reinforced concrete pipe ( outside diameter
of 16.50 inches) from Sta 10+00, 40 feet Left to STA 10+00, 65 feet Right on 4-inch bedding
material. The 12-inch RCP outlet is to be installed at Sta 10+00, 40 feet Left at an invert
elevation of 652.50.



If the conduit is installed at a 1.40% slope, what is the elevation of the foundation grade at Sta
10+00, 45 feet Right?



a) 652.04

b) 653.17

c) 653.36

d) 653.50 - Answer ?



On the reservoir side of a dam, erosion protection against wave action should extend up the
slope to at least which level?



a) crest of dam

, During stage construction while installing drainage, the contractor must complete which two of
the following tasks? (Choose two).



a) Bulk head the pipe until the system is complete.

b) Complete the entire system before it rains.

c) Maintain the existing drainage system until the new system is functional.

d) Provide temporary connections as needed to maintain the existing system. - Answer c)
Maintain the existing drainage system until the new system is functional.

d) Provide temporary connections as needed to maintain the existing system.



After flushing but before connecting a new main to the existing system, what test does an
inspector need to verify before placing the main into service?



a) bacteriological testing

b) cover testing

c) deflection testing

d) pressure testing - Answer d) pressure testing



Which three types of inspections are completed for sign structures? (Choose three).



a) final inspection

b) interim inspection

c) initial inspection

d) routine inspection - Answer b) interim inspection

c) initial inspection

d) routine inspection



How many times per foot should loop lead-in wires be twisted?



a) 3 turns per foot

b) 5 turns per foot

c) 6 turns per foot
R235,19
Get access to the full document:

100% satisfaction guarantee
Immediately available after payment
Both online and in PDF
No strings attached


Document also available in package deal

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
TestSolver9 Webster University
Follow You need to be logged in order to follow users or courses
Sold
716
Member since
2 year
Number of followers
124
Documents
23916
Last sold
11 hours ago
TESTSOLVER9 STORE

TOPNOTCH IN LEARNING MATERIALS,(EXAMS,STUDYGUIDES NOTES ,REVIEWS,FLASHCARDS ,ALL SOLVED AND PACKAGED.OUR STORE MAKE YOUR EDUCATION JOURNEY EFFICIENT AND EASY.WE ARE HERE FOR YOU FEEL FREE TO REACH US OUT .

3,6

125 reviews

5
56
4
18
3
21
2
9
1
21

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their exams and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can immediately select a different document that better matches what you need.

Pay how you prefer, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card or EFT and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions