100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

ESTIMATES LEVEL 2 TEST QUESTIONS AND ANSWERS

Rating
-
Sold
-
Pages
15
Grade
A+
Uploaded on
03-09-2025
Written in
2025/2026

ESTIMATES LEVEL 2 TEST QUESTIONS AND ANSWERS

Institution
ESTIMATES LEVEL 2
Course
ESTIMATES LEVEL 2









Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
ESTIMATES LEVEL 2
Course
ESTIMATES LEVEL 2

Document information

Uploaded on
September 3, 2025
Number of pages
15
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

Science Engineering Civil Engineering


ESTIMATES LEVEL 2 TEST QUESTIONS AND
ANSWERS
2025



Estimating Final Exam



Flashcard sets Study guides




Practice questions for this set



We put together estimates all the time in True
our everyday lives, often with little or no
calculating.

The different project delivery systems use False
the same types of estimates— conceptual,
preliminary and detailed—at various stages
in the development of the project.

, With the design- build method, the owner True
indicates that he or she requires a certain
facility and usually outlines some
parameters relating to location, size, design
and the desired time of occupancy.

Most general contractors and subtrades False
enter into cost-plus contracts in order to
perform a defined scope of work.

A(n) __ in its essence is an assessment of estimate
the probable total cost of some future
activity.

A ___estimate has to be prepared from a conceptual
minimum amount of information because it
is required at a time when the project is
often little more than a vague idea in the
mind of the owner.

Once the design of a project is underway, preliminary
budget amounts can be established for the
various elements of the project using
procedures for a___ estimate.

Using a construction management fast tracking
organization seeks to facilitate overlap
between project stages, often referred to
as __ , to allow earlier completion of the
project.

____ contracts are usually the owner's choice Cost-plus
of last resort because they can place the
owner in a vulnerable financial position.

____ contracts are based on a pricing Unit-price
schedule that consists of a breakdown of
the work and estimated quantities for each
of the items on the breakdown.

The basis of a___ is the accurate detailed estimate
assessment of the work in the form of a
quantity takeoff that can only be obtained
from the full design of the project

Construction groups in major cities have True
formed associations or plan service centers
where both public and private bodies may
deposit plans and specifications of projects
calling for bids.

In a closed bid system the number of False
companies invited to bid is typically limited
to no more than ten contractors who are
known to the owner or designers and who
meet the qualification criteria set by the
owner.

An effective way to proceed with the False
planning of estimating operations is
achieved by means of a simple line chart
form of time schedule.
R293,63
Get access to the full document:

100% satisfaction guarantee
Immediately available after payment
Both online and in PDF
No strings attached

Get to know the seller
Seller avatar
nvstuvia2025
3,0
(2)

Get to know the seller

Seller avatar
nvstuvia2025 Teachme2-tutor
Follow You need to be logged in order to follow users or courses
Sold
9
Member since
11 months
Number of followers
1
Documents
238
Last sold
2 months ago
professional academic Tutor

As a trusted professional working as a study material sourcing agent, I offer authentic exam papers directly sourced from reputable institutions, my papers serve as invaluable tools to aid aspiring nurses and many other professions in their exam preparations. Backed by my experience and expertise, I ensure that each paper is meticulously crafted.

3,0

2 reviews

5
1
4
0
3
0
2
0
1
1

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their exams and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can immediately select a different document that better matches what you need.

Pay how you prefer, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card or EFT and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions