100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

ACI Concrete Field-Testing Technician Grade I – Exam Questions and Verified ASTM C1064, C172, and Slump Test Answers

Rating
-
Sold
-
Pages
14
Grade
A+
Uploaded on
28-08-2025
Written in
2025/2026

Description: This exam prep document provides 100% verified ACI Grade I questions and answers. It covers ASTM standards such as C1064 (temperature), C172 (sampling), and detailed slump test procedures. Other topics include air content determination, curing, rodding, vibration, and equipment requirements. Designed for technician certification candidates, it ensures comprehensive coverage of field testing methods. The sensor of the temperature measuring device shall be submerged a minimum of _____ in. [_____mm] into the freshly mixed concrete. - answer3 in. [75 mm] The temperature measuring device shall have a capacity of measuring temperature of freshly mixed concrete to +- _____ degrees F [+- _____ C] throughout a range of _____. - answer1 degree F [0.5 C], 30 degrees F to 120 F [0 C to 50 C] The temperature measuring device shall be calibrated _____, or whenever there is a question of _____. - answerAnnually, accuracy The temperature of concrete Page1 may be measured in a wheelbarrow. True or False? - answerTrue The temperature of concrete may be measured in a wall form. True of False - answerTrue A composite sample of concrete is required even if the only purpose for obtaining the sample is to determine temperature. True of False? - answerFalse What must be done to the sample container prior to sampling the concrete? - answerDampen (with water) What must be done to the concrete surrounding the temperature measuring device after the device is submerged in the fresh concrete. - answerGently press the concrete around the temperature measuring device at the surface of the concrete How long must the temperature measuring device remain in the freshly mixed concrete? - answerAt least 2 minutes but not more than 5 minutes After the temperature of the concrete is read, what is required? - answerReporting of temperature The temperature of concrete is reported to the nearest _____ degrees F [_____ C] - answer1 degree F [0.5 C] According to ASTM C1064, what is one reason to take the temperature of concrete? - answerVerify conformance to a specified requirement for temperature of concrete A maximum temperature of freshly mixed concrete is specified in ASTM C1064. True of False? - answerFalse The sample of concrete used for temperature determination must be rodded 25 times. True or False? - answerFalse Sampling by this method is required when tests are to be made to determine _____ with specification requirements. - answerCompliance This method covers sampling from four types of mixtures Page2 which are _____, _____, _____, and _____. - answerStationary mixers, paving mixers, revolving drum mixers, and open top mixers The maximum allowable time between obtaining the first and final portions of a composite sample is _____ minutes. - answer15 Portions of a composite sample shall be thoroughly remixed bfore beginning tests on the sample. True of False? - answerTrue The maximum elapsed time allowed between obtaining the final portion of the composite sample and beginning the tests for slump, temperature, and air content is _____ minutes. - answer5 The molding of strength test specimens shall begin within _____ minutes after fabricating the composite sample. - answer15 The concrete sample must be protected from contamination and _____. - answerRapid evaporation The minimum size sample for making strength test specimens is _____. - answer28 L (1ft^3) When sampling from a stationary mixer, the batch must be sampled at _____ or more regularly spaced intervals during discharge of the middle portion of the batch - answer2 The composite sample for a paving mixer must represent a minimum of _____ different portions of the batch of concrete taken from the pile after discharge. - answer5 When sampling from a revolving drum truck mixer, concrete must be sampled at a minimum of _____ regularly spaced intervals during discharge of the middle portion of this batch. - answer2 Concrete samples from a truck mixer must be obtained before any water or admixtures are added to the mixer at the job site. True or False? - answerFalse The composite samples from a truck mixer must be obtained from the _____ portion of the batch. - answerMiddle When the

Show more Read less
Institution
ACI
Course
ACI









Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
ACI
Course
ACI

Document information

Uploaded on
August 28, 2025
Number of pages
14
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

ACI Concrete Field-Testing Technician Grade I – Exam

Questions and Verified ASTM C1064, C172, and Slump

Test Answers


Description: This exam prep document provides 100% verified ACI Grade I questions

and answers. It covers ASTM standards such as C1064 (temperature), C172

(sampling), and detailed slump test procedures. Other topics include air content

determination, curing, rodding, vibration, and equipment requirements. Designed

for technician certification candidates, it ensures comprehensive coverage of field-

testing methods.



The sensor of the temperature measuring device shall be submerged a minimum of

_____ in. [_____mm] into the freshly mixed concrete. - answer✔✔3 in. [75 mm]

The temperature measuring device shall have a capacity of measuring temperature

of freshly mixed concrete to +- _____ degrees F [+- _____ C] throughout a range of

_____. - answer✔✔1 degree F [0.5 C], 30 degrees F to 120 F [0 C to 50 C] The

temperature measuring device shall be calibrated _____, or whenever there is a

question of _____. - answer✔✔Annually, accuracy The temperature of concrete
1
Page




may be measured in a wheelbarrow. True or False? - answer✔✔True The

, temperature of concrete may be measured in a wall form. True of False -

answer✔✔True A composite sample of concrete is required even if the only

purpose for obtaining the sample is to determine temperature. True of False? -

answer✔✔False What must be done to the sample container prior to sampling

the concrete? - answer✔✔Dampen (with water) What must be done to the

concrete surrounding the temperature measuring device after the device is

submerged in the fresh concrete. - answer✔✔Gently press the concrete around

the temperature measuring device at the surface of the concrete How long must the

temperature measuring device remain in the freshly mixed concrete? -

answer✔✔At least 2 minutes but not more than 5 minutes After the temperature

of the concrete is read, what is required? - answer✔✔Reporting of temperature

The temperature of concrete is reported to the nearest _____ degrees F [_____ C] -

answer✔✔1 degree F [0.5 C] According to ASTM C1064, what is one reason to

take the temperature of concrete? - answer✔✔Verify conformance to a specified

requirement for temperature of concrete A maximum temperature of freshly mixed

concrete is specified in ASTM C1064. True of False? - answer✔✔False The sample

of concrete used for temperature determination must be rodded 25 times. True or

False? - answer✔✔False Sampling by this method is required when tests are to be

made to determine _____ with specification requirements. -

answer✔✔Compliance This method covers sampling from four types of mixtures
2




which are _____, _____, _____, and _____. - answer✔✔Stationary mixers, paving
Page
R172,69
Get access to the full document:

100% satisfaction guarantee
Immediately available after payment
Both online and in PDF
No strings attached

Get to know the seller
Seller avatar
hamedbash
1,0
(1)

Get to know the seller

Seller avatar
hamedbash Liberty University
Follow You need to be logged in order to follow users or courses
Sold
4
Member since
1 year
Number of followers
3
Documents
969
Last sold
7 months ago
Hamed Golden Store.

Welcome, Here You Will Find All Documents, Package Deals Offered By Seller Hamed.

1,0

1 reviews

5
0
4
0
3
0
2
0
1
1

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their exams and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can immediately select a different document that better matches what you need.

Pay how you prefer, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card or EFT and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions