ECCC GE Study Set Questions and Answers (Expert Solutions)

Institution
ECCC
Course
ECCC










Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
ECCC
Course
ECCC

Document information

Uploaded on
July 30, 2025
Number of pages
17
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

Page | 1



ECCC GE Study Set Questions and Answers
(Expert Solutions)


Q: GE101: Introduction to General Engineering ANS 🗹🗹: · Purpose of GE Module:
Develop officers with ability to plan and generate General Engineering effects in support
of the maneuver commander during ULO

· Definition of GE: Those engineering capabilities and activities other than combat
engineering that modify, maintain, or protect the physical environment.


Q: · GE is utilized in support of: ANS 🗹🗹: o Defense- Continuously conducted to harden
and prepare positions, facilities, installations

o Offense- Providing assured mobility of forces from ports of debarkation to forward
AOs

o Stability- Focus is likely GE capabilities applied to restore essential services and
support infrastructure development


Q: Geospatial ANS 🗹🗹: supports vertical and horizontal construction


Q: GE104: Engineer Reconnaissance ANS 🗹🗹: · Engineer Reconnaissance Is NOT a
FORM of reconnaissance. The forms are route, zone, area, reconnaissance in force, and
special.

· USACE Contingency Elements (UCE): Forward Support Team Advance (FEST-A),
Reconnaissance Team (RT), Advanced Echelon (ADVON) Team, Contingency Engineer
District (CED).

· Technical Reconnaissance vs. Tactical Reconnaissance


Q: GE105: Planning Construction Operations ANS 🗹🗹: Projects come from requestor
(unit or installation entity) identifies a need which can be met by engineer support

, Page | 2

Q: MDMP in Construction Planning 1 of 2 ANS 🗹🗹: o MDMP Step 1: Receive Mission->
Understand what you actually need to do. Gather tools, time analysis, higher intent,
shortfalls, Excess. Do not overlook geospatial.

o MDMP Step 2: Mission Analysis-> Compile analysis into one effort. Involve BDE S2
Geospatial cell


Q: MDMP in Construction Planning 2 of 2 ANS 🗹🗹: o MDMP Step 3-6: COA
development, COA analysis, COA comparison, COA approval

o MDMP Step 7: Rehearsals


Q: Real Estate ANS 🗹🗹: The overall collection of property


Q: When planning construction operations also account for...? ANS 🗹🗹: · Protection
Considerations, Sustainment Considerations...


Q: MDMP COA development produces what? ANS 🗹🗹: · different designs to meet the
commander's intent.


Q: GE107: Project Management ANS 🗹🗹: Is application of knowledge, skills, and
resources to accomplish activities that are intended to achieve a specific goal.


Q: · A project will: ANS 🗹🗹: o Not be part of ongoing day to day business.

o Involve notable risk.

o Be significantly impacted upon failure of activities.

Have at least 2 people or elements working together


Q: Project Components ANS 🗹🗹: o Time- Time to complete the project as reflected in
your project schedule.

o Money- Project budget based on cost of the resources.

Scope- Goals and tasks of project and work required to complete them

, Page | 3

Q: Project Steps ANS 🗹🗹: Defining/Initiating, Planning, Doing/Executing, Reviewing,
Monitoring and Controlling


Q: Resource Estimation ANS 🗹🗹: Reference: · Work rates from Page 174 in Battle Book,
Activity Estimation Steps (6 steps).


Q: Standard Effort Equation ANS 🗹🗹: (Quantity) X (Work Rate)


Q: Troop Effort Equation ANS 🗹🗹: (Standard Effort) / (Efficiency)


Q: Duration Equation ANS 🗹🗹: (Troop Effort) / (Crew Size)


Q: Project Equation Table ANS 🗹🗹: Quantity Work Rate Standard Effort Efficiency
Troop Effort Crew Size Duration Remarks


Q: · Node Time Estimate: ANS 🗹🗹: o Forward Pass: (Early Start) + (Duration) = (Early
Finish)

o Backward Pass: (Late Finish) - (Duration) = (Late Start)


Q: Critical Path Characteristics ANS 🗹🗹: o Longest time path through the network

o Has no float

o (Early Start) = (Late Start), (Early Finish) = (Late Finish)


Q: Total Float ANS 🗹🗹: o Total Float (TF): Amount of time an activity can be delayed
without delaying project

TF=LS-ES or TF=LF-EF


Q: Interfering Float (IF) ANS 🗹🗹: o Float which if an activity is delayed, will cause a
delay on one or more activities
R244,75
Get access to the full document:

100% satisfaction guarantee
Immediately available after payment
Both online and in PDF
No strings attached

Get to know the seller
Seller avatar
StudyRM

Get to know the seller

Seller avatar
StudyRM University Of California - Los Angeles (UCLA)
Follow You need to be logged in order to follow users or courses
Sold
3
Member since
5 months
Number of followers
0
Documents
4027
Last sold
2 months ago

0,0

0 reviews

5
0
4
0
3
0
2
0
1
0

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their exams and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can immediately select a different document that better matches what you need.

Pay how you prefer, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card or EFT and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions