mq mq mq mq
mq Project Management 9th Edition
mq mq mq mq
Kathy Schwalbe, Verified Chapters
mq mq mq
Page 1 of
mq mq
638
,True / False
mq mq
1. Until the 1980s, project management primarily focused on providing schedule and resource data
mq mq mq mq mq mq mq mq mq mq mq mq
to top management in the military, computer, and construction industries.
mq mq mq mq mq mq mq mq mq mq
a. True
b. False
ANSWER: True
RATIONALE: Feedback: Until the 1980s, project management primarily focused on mq mq mq mq mq mq mq mq
providing schedule and resource data to top management in the military,
mq mq mq mq mq mq mq mq mq mq mq
computer, and construction industries. Today’s project management
mq mq mq mq mq mq mq
involves much more, and people in every industry and every country
mq mq mq mq mq mq mq mq mq mq mq
manage projects.
mq mq
POINTS: 1
DIFFICULTY: Difficulty: Easy mq
REFERENCES: p.2
LEARNING OBJECTIVES: mq INFO.SCHW.14.1 - LO: 1-1 mq mq mq
NATIONAL STANDARDS: mq United States - BUSPROG: Technology
mq mq mq mq
TOPICS: Introduction
KEYWORDS: Bloom's: Knowledge mq
2. A difference between operations and projects is that operations end when their objectives have
mq mq mq mq mq mq mq mq mq mq mq mq mq
been reached, whereas projects do not.
mq mq mq mq mq mq
a. True
b. False
ANSWER: False
RATIONALE: Feedback: Projects are different from operations in that they end when mq mq mq mq mq mq mq mq mq mq
their objectives have been reached or the project has been terminated.
mq mq mq mq mq mq mq mq mq mq mq
POINTS: 1
DIFFICULTY: Difficulty: Moderate mq
REFERENCES: p.4
LEARNING OBJECTIVES: mq INFO.SCHW.14.2 - LO: 1-2 mq mq mq
NATIONAL STANDARDS: mq United States - BUSPROG: Analytic
mq mq mq mq
TOPICS: What is a Project?
mq mq mq
KEYWORDS: Bloom's: Comprehension mq
3. Every project should have a well-defined objective.
mq mq mq mq mq mq
a. True
Page 2 of mq mq
638
,2
b. False
ANSWER: True
RATIONALE: Feedback: A project has a unique purpose. Every project should have a well-
mq mq mq mq mq mq mq mq mq mq mq mq
defined objective. mq
POINTS: 1
DIFFICULTY: Difficulty: Easy mq
REFERENCES: p.6
LEARNING OBJECTIVES:
mq INFO.SCHW.14.2 - LO: 1-2 mq mq mq
NATIONAL STANDARDS:
mq United States - BUSPROG: Analytic
mq mq mq mq
TOPICS: What is a Project?
mq mq mq
KEYWORDS: Bloom's: Knowledge mq
4. Projects should be developed in increments.
mq mq mq mq mq
a. True
b. False
ANSWER: True
RATIONALE: Feedback: A project is developed using progressive elaboration. Projects are
mq mq mq mq mq mq mq mq mq
often defined broadly when they begin, and as time passes, the specific
mq mq mq mq mq mq mq mq mq mq mq mq
details of the project become clearer. Therefore, projects should be
mq mq mq mq mq mq mq mq mq mq
developed in increments.
mq mq mq
POINTS: 1
DIFFICULTY: Difficulty: Moderate mq
REFERENCES: p.6
LEARNING OBJECTIVES:
mq INFO.SCHW.14.2 - LO: 1-2 mq mq mq
NATIONAL STANDARDS:
mq United States - BUSPROG: Analytic
mq mq mq mq
TOPICS: What is a Project?
mq mq mq
KEYWORDS: Bloom's: Comprehension mq
5. Resources in a project should be used effectively because they are limited.
mq mq mq mq mq mq mq mq mq mq mq
a. True
b. False
ANSWER: True
RATIONALE: Feedback: A project requires resources, often from various areas.
mq mq mq mq mq mq mq mq
Resources, however, are limited and must be used effectively to meet
mq mq mq mq mq mq mq mq mq mq mq
project and other corporate goals.
mq mq mq mq mq
POINTS: 1
DIFFICULTY: Difficulty: Moderate mq
REFERENCES: p. 7 mq
LEARNING OBJECTIVES:
mq INFO.SCHW.14.2 - LO: 1-2 mq mq mq
NATIONAL STANDARDS:
mq United States - BUSPROG: Analytic
mq mq mq mq
TOPICS: What is a Project?
mq mq mq
KEYWORDS: Bloom's: Comprehension mq
Page 3 of mq mq
638
, 3
6. A project manager’s primary role is to provide the funding for a project.
mq mq mq mq mq mq mq mq mq mq mq mq
a. True
b. False
ANSWER: False
RATIONALE: Feedback: A project sponsor usually provides the direction and funding for a
mq mq mq mq mq mq mq mq mq mq mq
project.
mq
POINTS: 1
DIFFICULTY: Difficulty: Easy mq
REFERENCES: p.7
LEARNING OBJECTIVES: mq INFO.SCHW.14.2 - LO: 1-2 mq mq mq
NATIONAL STANDARDS: mq United States - BUSPROG: Analytic
mq mq mq mq
TOPICS: What is a Project? mq mq mq
KEYWORDS: Bloom's: Knowledge mq
7. One of the main reasons why project management is challenging is because of the factor of
mq mq mq mq mq mq mq mq mq mq mq mq mq mq mq
uncertainty.
mq
a. True
b. False
ANSWER: True
RATIONALE: Feedback: A project involves uncertainty. Every project is unique and thus it
mq mq mq mq mq mq mq mq mq mq mq
is sometimes difficult to define its objectives clearly, estimate how long it will
mq mq mq mq mq mq mq mq mq mq mq mq mq
take to complete, or determine how much it will cost. This uncertainty is
mq mq mq mq mq mq mq mq mq mq mq mq mq
one of the main reasons project management is so challenging.
mq mq mq mq mq mq mq mq mq mq
POINTS: 1
DIFFICULTY: Difficulty: Moderate mq
REFERENCES: p.7
LEARNING OBJECTIVES: mq INFO.SCHW.14.2 - LO: 1-2 mq mq mq
NATIONAL STANDARDS: mq United States - BUSPROG: Analytic
mq mq mq mq
TOPICS: What is a Project? mq mq mq
KEYWORDS: Bloom's: Comprehension mq
8. Questions about how a team will track schedule performance is related to a project’s scope.
mq mq mq mq mq mq mq mq mq mq mq mq mq mq
a. True
b. False
ANSWER: False
RATIONALE: Feedback: Project scope deals with questions such as, ―What work will be
mq mq mq mq mq mq mq mq mq mq mq
done as part of the project?‖, ―What unique product, service, or result does
mq mq mq mq mq mq mq mq mq mq mq mq mq
the customer or sponsor expect from the project?‖, or ―How will the scope
mq mq mq mq mq mq mq mq mq mq mq mq mq
be verified?‖
mq mq
POINTS: 1
DIFFICULTY: Difficulty: Moderate mq
REFERENCES: p.7
LEARNING OBJECTIVES: mq INFO.SCHW.14.2 - LO: 1-2 mq mq mq
Page 3 of mq mq
638