Assignment 2 2025
Detailed Solutions, References & Explanations
Unique number: 796010
Due Date: 30 June 2025
SECTION A: QUESTION 1 CASE STUDY
1.1 Inventory-related decisions
a) Work-in-progress (WIP) Inventory
This category refers to partially completed goods that are still in the production process.
For Toyota South Africa, disruptions such as strikes or supplier delays (e.g., from Auto
Parts South Africa) can stall the movement of components, leading to unfinished
vehicles on the assembly line. Keeping a moderate level of WIP inventory allows
production to continue even when certain components are delayed.
Trade-off: While higher WIP levels improve responsiveness to supply interruptions, they
increase holding costs and may reduce operational efficiency if excess semi-finished
products pile up without completion.
Terms of use
By making use of this document you agree to:
Use this document as a guide for learning, comparison and reference purpose,
Terms of use
Not to duplicate, reproduce and/or misrepresent the contents of this document as your own work,
By making use of this document you agree to:
Use this document
Fully accept the consequences
solely as a guide forshould you plagiarise
learning, reference,or and
misuse this document.
comparison purposes,
Ensure originality of your own work, and fully accept the consequences should you plagiarise or misuse this document.
Comply with all relevant standards, guidelines, regulations, and legislation governing academic and written work.
Disclaimer
Great care has been taken in the preparation of this document; however, the contents are provided "as is" without any express or
implied representations or warranties. The author accepts no responsibility or liability for any actions taken based on the
information contained within this document. This document is intended solely for comparison, research, and reference purposes.
Reproduction, resale, or transmission of any part of this document, in any form or by any means, is strictly prohibited.
, +27 67 171 1739
SECTION A: QUESTION 1 CASE STUDY
1.1 Inventory-related decisions
a) Work-in-progress (WIP) Inventory
This category refers to partially completed goods that are still in the production
process. For Toyota South Africa, disruptions such as strikes or supplier delays (e.g.,
from Auto Parts South Africa) can stall the movement of components, leading to
unfinished vehicles on the assembly line. Keeping a moderate level of WIP inventory
allows production to continue even when certain components are delayed.
Trade-off: While higher WIP levels improve responsiveness to supply interruptions,
they increase holding costs and may reduce operational efficiency if excess semi-
finished products pile up without completion.
b) Safety or Buffer Inventory
Safety stock protects against unforeseen disruptions such as component shortages
or environmental disasters (e.g., the 2022 floods in KwaZulu-Natal). For Toyota,
keeping extra brake pedals or fuel tanks in stock could have prevented the total
production shutdown during the ASA strike.
Trade-off: Maintaining safety inventory reduces risk and improves continuity, but it
ties up capital and goes against the Toyota Production System’s lean principles,
which aim to eliminate waste and reduce excess stock.
c) In-transit Inventory
In-transit inventory includes goods currently being transported from suppliers (both
local and international) to Toyota’s plant. With a potential shift to 60% global
sourcing, Toyota’s exposure to longer lead times and shipping delays increases. For
instance, delays at the Durban port during the 2022 floods highlight the vulnerability
of in-transit inventory.
Disclaimer
Great care has been taken in the preparation of this document; however, the contents are provided "as is"
without any express or implied representations or warranties. The author accepts no responsibility or
liability for any actions taken based on the information contained within this document. This document is
intended solely for comparison, research, and reference purposes. Reproduction, resale, or transmission
of any part of this document, in any form or by any means, is strictly prohibited.