1. What are the three construction standards for force protection? -
🧠ANSWER ✔✔a. Organic, initial, temporary
1. What are the three force protection threat levels? - 🧠ANSWER ✔✔a.
Level I (agents, terrorists, civil disturbances) Level II (small tactical units,
guerillas), Level III (large conventional force)
1. What are the priorities of effort for force protection? - 🧠ANSWER ✔✔a.
Establish perimeters and standoff; establish access control points (ACPs
and ECPs); enhance personnel protection
1. True or False: Engineer Reconnaissance is one of the five forms of
reconnaissance. - 🧠ANSWER ✔✔a. False: Engineer Recon refers to
specialized skills that can be brought to bear on any of the forms of tactical
reconnaissance.
COPYRIGHT©JOSHCLAY 2025/2026. YEAR PUBLISHED 2025. COMPANY REGISTRATION NUMBER: 619652435. TERMS OF USE. PRIVACY
STATEMENT. ALL RIGHTS RESERVED
1
, Name four USACE contingency response elements from smallest to
largest. - 🧠ANSWER ✔✔FEST-A, Recon Team, ADVON, Contingency
Engineer District
What is the expected lifespan for a basecamp built to organic, initial,
temporary, and semi-permanent standard? - 🧠ANSWER ✔✔a. Organic: 90
days or less Initial: 6 months or less Temporary: 5 years or less
Semipermanent: 2-10 years
What are the 4 principles of basecamp planning? - 🧠ANSWER
✔✔Scalability, Standardization, Sustainability, Survivability
What are the steps to the basecamp development planning process? -
🧠ANSWER ✔✔Initiate preliminary planning, Location selection, Land Use
Planning, Facility Requirements Development, General Site Planning,
Design Guide Phasing & Construction, Maintenance & updates,
Cleanup/Closure/Archive
What are the steps to the construction project phasing model? - 🧠ANSWER
✔✔Construction Project Phasing Model: the subphases of the design
guide, programming, and construction step of BCDPP. Initial project
planning, preliminary construction planning, detailed project planning, final