100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

PRO4801 Assignment 2 (QUALITY ANSWERS) 2025

Rating
-
Sold
1
Pages
15
Grade
A+
Uploaded on
29-04-2025
Written in
2024/2025

This document contains workings, explanations and solutions to the PRO4801 Assignment 2 (QUALITY ANSWERS) 2025. For assistance whats-app us on 0.6.8..8.1.2..0.9.3.4... Project managers are responsible for making decisions and performing various other duties. Yet, their authority is often limited, and they must seek other power sources. This requires a new set of skills and the capacity to assemble mechanisms that complement performance. (i) Illustrate the different focal points of a project manager’s role. Explain the effect of a project manager’s “umbrella” responsibility in projects. (15) (ii) Distinguish between and explain the different categories of qualifications for a successful project manager. The South African Satellite (SAS) project for installing two very advanced satellite systems has been assigned to the Board. Explain the (i) Specific content, typical activities, and (16) (ii) Different management approaches of the Board, (9) (referring to each of the four phases in the SAS systems development cycle). [(i) 4 marks each phase; (ii) 9 marks] Projects go through many uncertainties. Therefore, projects must be able to adjust. Traditional organisations are ineffective in the face of rapid change. In contrast, project organisations should be organic. (i) Explain what " organic" means. (10) (ii) Distinguish how the several kinds of integrators can enhance interaction, coordination, and mutual adjustments. Project managers must be able to adapt and understand structural patterns and specific roles that enhance project performance. (i) Defend the selection of a project structure (form of organisation) by referring to the importance of organisational structure for projects. (20) (ii) Differentiate between the formal and informal organisational structures, and explain the informal organisation’s role in project management.

Show more Read less









Whoops! We can’t load your doc right now. Try again or contact support.

Document information

Uploaded on
April 29, 2025
Number of pages
15
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

PRO4801
Assignment 2 2025

Unique number:

Due Date: May 2025


This document includes:

 Helpful answers and guidelines
 Detailed explanations and/ or calculations
 References




Connect with the tutor on

+27 68 812 0934

, © Study Shack 2025. All rights Reserved +27 68 812 0934

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
StudyShack Cornerstone College, Pretoria, Gauteng
View profile
Follow You need to be logged in order to follow users or courses
Sold
30694
Member since
9 year
Number of followers
13937
Documents
1800
Last sold
1 month ago
Study Guides for Unisa Students

4,1

1778 reviews

5
970
4
335
3
264
2
80
1
129

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their exams and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can immediately select a different document that better matches what you need.

Pay how you prefer, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card or EFT and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions