100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

LEED AP O+M Credits Exam 2025 Questions and Answers 100% Pass

Rating
-
Sold
-
Pages
28
Grade
A+
Uploaded on
26-04-2025
Written in
2024/2025

LEED AP O+M Credits Exam 2025 Questions and Answers 100% Pass Location and Transportation Credits - - Alternative Transportation Alternative Transportation - - Survey = 1 point - Results... 10% = 3 pts, 15% = 4 pts, etc all the way to 70% = 15 points Sustainable Sites credits - - Site Management Policy (prerequisite) - Site Development - Protect or Restore Habitat - Rainwater Management - Heat Island Reduction - Light Pollution Reduction - Site Management - Site Improvement Plan - Joint Use of Facilities (schools only) "Site Management Policy" intent - To preserve ecological integrity and encourage environmentally sensitive site management practices that provide a clean, well- maintained, and safe building exterior while supporting high-performance building operations and integration 2COPYRIGHT © 2025 BY GRACE AMELIA, ALL RIGHTS RESERVED Site Management Policy Requirements - Establishment: create and implement site management policy that employs best management practices for the operational elements on the building and grounds Performance: None Site Management Policy Required Documentation - - Site management policy document - Justification for operational elements not included in policy "Site Development - Protect or Restore Habitat" intent - To conserve existing natural areas and restore damaged areas to provide habitat and promote biodiversity "Site Development - Protect or Restore Habitat" Requirements - - Option 1: On-site Restoration (2 points) - Establishment: have native/adapted vegetation on 20% of the total site area and a minimum of 5,000 sf - Option 2: Financial Support (1 point) - Establishment: Financial support equal to $.05 per square foot of total site area. - Performance: Provide specifid financial support annually "Site Development - Protect or Restore Habitat" Referenced Standards - - U.S. EPA Ecoregions - Land Trust Alliance Accreditation "Site Development - Protect or Restore Habitat" Required Documentation - Option 1: 3COPYRIGHT © 2025 BY GRACE AMELIA, ALL RIGHTS RESERVED - Description of native or adapted vegetation - Site plan showing boundary, footprint, preserved greenfield area, previously developed area, restored area, vegetation, etc Option 2: - Confirmation land trust is accredited by Land Trust Alliance - Confirmation that financial support will be provided annually "Rainwater Management" intent - To reduce runoff volume and improve water quality by replicating the natural hydrology and water balance of the site, based on historical conditions and undeveloped ecosystems in the region. worth 3 points "Rainwater Management" Requirements - Establishment: Use low-impact development to capture and treat water from 25% of impervious surfaces for the 95th percentile storm event. Performance: Document annual inspections, identifying areas of erosion and maintenance needs. Provide necessary maintenance within 60 days of inspection. "Rainwater Management" Referenced Standards - U.S. EPA Technical Guidance on Implementing the Rainwater Runoff Requirements for Federal projects under Section 438 of the Energy Independence and Security Act "Heat Island Reduction" intent - To minimize the effects on microclimates and human and wildlife habitats by reducing heat islands. 4COPYRIGHT © 2025 BY GRACE AMELIA, ALL RIGHTS RESERVED "Heat Island Reduction" Requirements - Option 1: Nonroof (1 point) - Establishment: Use any combo of the strategies for a minimum of 50% of the site paving - Performance: implement maintenance program that cleans all high-reflectance paving surfaces every 3 years. Option 2: Roof (1 point) - Establishment: Use roofing materials of certain solar reflectance for at least 75% of the roof, or vegetated cover for at least 50% of roof. You ca

Show more Read less
Institution
LEED
Course
LEED










Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
LEED
Course
LEED

Document information

Uploaded on
April 26, 2025
Number of pages
28
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

LEED AP O+M Credits Exam 2025
Questions and Answers 100% Pass


Location and Transportation Credits - ✔✔- Alternative Transportation

Alternative Transportation - ✔✔- Survey = 1 point

- Results... 10% = 3 pts, 15% = 4 pts, etc all the way to 70% = 15 points

Sustainable Sites credits - ✔✔- Site Management Policy (prerequisite)

- Site Development - Protect or Restore Habitat

- Rainwater Management

- Heat Island Reduction

- Light Pollution Reduction

- Site Management

- Site Improvement Plan

- Joint Use of Facilities (schools only)

"Site Management Policy" intent - ✔✔To preserve ecological integrity and encourage
environmentally sensitive site management practices that provide a clean, well-
maintained, and safe building exterior while supporting high-performance building
operations and integration



COPYRIGHT © 2025 BY GRACE AMELIA, ALL RIGHTS RESERVED 1

,Site Management Policy Requirements - ✔✔Establishment: create and implement site
management policy that employs best management practices for the operational
elements on the building and grounds




Performance: None

Site Management Policy Required Documentation - ✔✔- Site management policy
document

- Justification for operational elements not included in policy

"Site Development - Protect or Restore Habitat" intent - ✔✔To conserve existing natural
areas and restore damaged areas to provide habitat and promote biodiversity

"Site Development - Protect or Restore Habitat" Requirements - ✔✔- Option 1: On-site
Restoration (2 points)

- Establishment: have native/adapted vegetation on 20% of the total site area and a
minimum of 5,000 sf




- Option 2: Financial Support (1 point)

- Establishment: Financial support equal to $.05 per square foot of total site area.

- Performance: Provide specifid financial support annually

"Site Development - Protect or Restore Habitat" Referenced Standards - ✔✔- U.S. EPA
Ecoregions

- Land Trust Alliance Accreditation

"Site Development - Protect or Restore Habitat" Required Documentation - ✔✔Option 1:




COPYRIGHT © 2025 BY GRACE AMELIA, ALL RIGHTS RESERVED 2

, - Description of native or adapted vegetation

- Site plan showing boundary, footprint, preserved greenfield area, previously
developed area, restored area, vegetation, etc




Option 2:

- Confirmation land trust is accredited by Land Trust Alliance

- Confirmation that financial support will be provided annually

"Rainwater Management" intent - ✔✔To reduce runoff volume and improve water
quality by replicating the natural hydrology and water balance of the site, based on
historical conditions and undeveloped ecosystems in the region.




worth 3 points

"Rainwater Management" Requirements - ✔✔Establishment: Use low-impact
development to capture and treat water from 25% of impervious surfaces for the 95th
percentile storm event.




Performance: Document annual inspections, identifying areas of erosion and
maintenance needs. Provide necessary maintenance within 60 days of inspection.

"Rainwater Management" Referenced Standards - ✔✔U.S. EPA Technical Guidance on
Implementing the Rainwater Runoff Requirements for Federal projects under Section
438 of the Energy Independence and Security Act

"Heat Island Reduction" intent - ✔✔To minimize the effects on microclimates and
human and wildlife habitats by reducing heat islands.



COPYRIGHT © 2025 BY GRACE AMELIA, ALL RIGHTS RESERVED 3
R214,61
Get access to the full document:

100% satisfaction guarantee
Immediately available after payment
Both online and in PDF
No strings attached


Document also available in package deal

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
GraceAmelia West Virginia University
Follow You need to be logged in order to follow users or courses
Sold
90
Member since
1 year
Number of followers
32
Documents
8992
Last sold
5 days ago
GraceAmelia\'s Emporium

Get a well Researched and Accurate Study Materials to Boost Your Grades and Excel Academically Offered by Seller Grace.

2,8

8 reviews

5
2
4
1
3
1
2
1
1
3

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their exams and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can immediately select a different document that better matches what you need.

Pay how you prefer, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card or EFT and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions