Asbestos Project Monitor Exam Questions with Correct Answers 2025/2026
Asbestos Project Monitor Exam Questions with Correct Answers 2025/2026 What is Surfactant? - Correct Answer A chemical that reduces the surface tension of water Class 1 Asbestos Project - Correct Answer Removal of TSI & Surfacing How do you find the Maximum Use of Concentration? MUC/MUL - Correct Answer PEL x PF = MUC What is the sequence for Phase 2 work area preparation? - Correct Answer 1. Set up signs 2.Build the worker Decon unit 3.Preparation of the regulated abatement work area 4. (NYS only) wait 4 hours What is the order of the Decon room from the work area out ? - Correct Answer Equipment room(dirty room) Airlock Shower Airlock Clean room What does NESHAP prohibits? - Correct Answer Prohibits visible emission and Prohibits any dry removal of ACM Who needs to be on site for a Class 1 or Class 2 Asbestos project ? - Correct Answer OSHA Competent Person Supervisor & Handlers What is the OSHA Respirator standard? - Correct Answer 29 CFR 1910 134
Written for
- Institution
- Asbestos supervisor
- Course
- Asbestos supervisor
Document information
- Uploaded on
- April 24, 2025
- Number of pages
- 13
- Written in
- 2024/2025
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
-
what is surfactant
-
class 1 asbestos project
-
how do you find the maximum use of concentration
-
what is the sequence for phase 2 work area prepara
Document also available in package deal