TDL Network Operations Questions with
Complete Solutions (Latest 2025)
Which of the following IS NOT a step in the MTN planning
process? - Correct Answers ✅Identify Surveillance
Responsibilities
(Wrong) Develop TDL IERs from commander's objectives
(Wrong) Develop MTN Voice Communications Architecture
Identify Separate Extended Interface Architecture
Which of the following is true concerning the MTA/MTN? -
Correct Answers ✅(Correct) Link 16 is the primary TDL on
the MTN due to greater information capability and bandwidth
What is the definition of a data loop? - Correct Answers
✅(Wrong) Same track number used for two or more different
tracks
Two or more tracks representing the same object reported on
the interface
Loss of tactical information due primarily to message
differences
A unit receives the same data on more than one path
Mutual Tracking is a plan in which all track-producing units
will ___________. - Correct Answers ✅(Correct) transmit
their track data allowing correlation rules to determine the
reporting responsibility (R2)
, POST TEST 5- Introduction to Joint Multi-
TDL Network Operations Questions with
Complete Solutions (Latest 2025)
Data Registration is ___________. - Correct Answers ✅A
condition of correct relative alignment between local and
remote track positional data
Used to divide reporting responsibility
(Wrong) Used to prevent an individual IU data base from
being overloaded
(Wrong) The procedure for determining data registration
corrective values known as Position Adjustment System
(PADS)
What type of filter allows an IU to filter data based on
geographic location of that data? - Correct Answers
✅(Correct) Geographic Filter
_________ produce and transmit surveillance tracks. - Correct
Answers ✅C2IUs
(Wrong) Non-C2JUs
STNs
(Wrong) F-22s