True / False
re re
1. Until the 1980s, project management primarily focused on providing schedule and resource data to top
re re re re re re re re re re re re re re
management in the military, computer, and construction industries.
re re re re re re re re
a. True
b. False
ANSWER: True
RATIONALE: Feedback: Until the 1980s, project management primarily focused on providing re re re re re re re re re
re schedule and resource data to top management in the military, computer, and
re re re re re re re re re re re
re construction industries. Today’s project management involves much more,
re re re re re re re
re and people in every industry and every country manage projects.
re re re re re re re re re
POINTS: 1
DIFFICULTY: Difficulty: Easy re
REFERENCES: p.2
LEARNING OBJECTIVES: re INFO.SCHW.14.1 - LO: 1-1 re re re
NATIONAL STANDARDS: re United States - BUSPROG: Technology
re re re re
TOPICS: Introduction
KEYWORDS: Bloom's: Knowledge re
2. A difference between operations and projects is that operations end when their objectives have been
re re re re re re re re re re re re re re
reached, whereas projects do not.
re re re re re
a. True
b. False
ANSWER: False
RATIONALE: Feedback: Projects are different from operations in that they end when their re re re re re re re re re re re
re objectives have been reached or the project has been terminated.
re re re re re re re re re
POINTS: 1
DIFFICULTY: Difficulty: Moderate re
REFERENCES: p.4
LEARNING OBJECTIVES: re INFO.SCHW.14.2 - LO: 1-2 re re re
NATIONAL STANDARDS: re United States - BUSPROG: Analytic
re re re re
TOPICS: What is a Project? re re re
KEYWORDS: Bloom's: Comprehension re
3. Every project should have a well-defined objective.
re re re re re re
a. True
Cengage Learning Testing, Powered by
re re re re
Page 2
re
Cognero
, b. False
ANSWER: True
RATIONALE: Feedback: A project has a unique purpose. Every project should have a well-defined
re re re re re re re re re re re re
objective.
re
POINTS: 1
DIFFICULTY: Difficulty: Easy re
REFERENCES: p.6
LEARNING OBJECTIVES:
re INFO.SCHW.14.2 - LO: 1-2 re re re
NATIONAL STANDARDS:re United States - BUSPROG: Analytic
re re re re
TOPICS: What is a Project?
re re re
KEYWORDS: Bloom's: Knowledge re
4. Projects should be developed in increments.
re re re re re
a. True
b. False
ANSWER: True
RATIONALE: Feedback: A project is developed using progressive elaboration. Projects are often
re re re re re re re re re re
defined broadly when they begin, and as time passes, the specific details of the
re re re re re re re re re re re re re re
project become clearer. Therefore, projects should be developed in increments.
re re re re re re re re re re
POINTS: 1
DIFFICULTY: Difficulty: Moderate re
REFERENCES: p.6
LEARNING OBJECTIVES:
re INFO.SCHW.14.2 - LO: 1-2 re re re
NATIONAL STANDARDS:re United States - BUSPROG: Analytic
re re re re
TOPICS: What is a Project?
re re re
KEYWORDS: Bloom's: Comprehension re
5. Resources in a project should be used effectively because they are limited.
re re re re re re re re re re re
a. True
b. False
ANSWER: True
RATIONALE: Feedback: A project requires resources, often from various areas. Resources,
re re re re re re re re re
however, are limited and must be used effectively to meet project and
re re re re re re re re re re re re
other corporate goals.
re re re
POINTS: 1
DIFFICULTY: Difficulty: Moderate re
REFERENCES: p. 7 re
LEARNING OBJECTIVES:
re INFO.SCHW.14.2 - LO: 1-2 re re re
NATIONAL STANDARDS:re United States - BUSPROG: Analytic
re re re re
TOPICS: What is a Project?
re re re
KEYWORDS: Bloom's: Comprehension re
Cengage Learning Testing, Powered by
re re re re
Page 3
re
Cognero
, 6. A project manager’s primary role is to provide the funding for a project.
re re re re re re re re re re re re
a. True
b. False
ANSWER: False
RATIONALE: Feedback: A project sponsor usually provides the direction and funding for a project. re re re re re re re re re re re re
POINTS: 1
DIFFICULTY: Difficulty: Easy re
REFERENCES: p.7
LEARNING OBJECTIVES: INFO.SCHW.14.2 - LO: 1-2
re re re re
NATIONAL STANDARDS: United States - BUSPROG: Analytic
re re re re re
TOPICS: What is a Project? re re re
KEYWORDS: Bloom's: Knowledge re
7. One of the main reasons why project management is challenging is because of the factor of uncertainty.
re re re re re re re re re re re re re re re re
a. True
b. False
ANSWER: True
RATIONALE: Feedback: A project involves uncertainty. Every project is unique and thus it is re re re re re re re re re re re re
sometimes difficult to define its objectives clearly, estimate how long it will take
re re re re re re re re re re re re re
to complete, or determine how much it will cost. This uncertainty is one of the
re re re re re re re re re re re re re re re
main reasons project management is so challenging.
re re re re re re re
POINTS: 1
DIFFICULTY: Difficulty: Moderate re
REFERENCES: p.7
LEARNING OBJECTIVES: re INFO.SCHW.14.2 - LO: 1-2 re re re
NATIONAL STANDARDS: re United States - BUSPROG: Analytic
re re re re
TOPICS: What is a Project? re re re
KEYWORDS: Bloom's: Comprehension re
8. Questions about how a team will track schedule performance is related to a project’s scope.
re re re re re re re re re re re re re re
a. True
b. False
ANSWER: False
RATIONALE: Feedback: Project scope deals with questions such as, ―What work will be done re re re re re re re re re re re re
as part of the project?‖, ―What unique product, service, or result does the
re re re re re re re re re re re re re
customer or sponsor expect from the project?‖, or ―How will the scope be
re re re re re re re re re re re re re
verified?‖
re
POINTS: 1
DIFFICULTY: Difficulty: Moderate re
REFERENCES: p.7
LEARNING OBJECTIVES: re INFO.SCHW.14.2 - LO: 1-2 re re re