100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4,6 TrustPilot
logo-home
Exam (elaborations)

SPēD SAPPC - PHYSEC EXAM QUESTIONS AND ANSWERS GRADED A+

Rating
-
Sold
-
Pages
8
Grade
A+
Uploaded on
07-04-2025
Written in
2024/2025

SPēD SAPPC - PHYSEC EXAM QUESTIONS AND ANSWERS GRADED A+ B. It must be in an area designated as a Restricted Area - Answers When designing a new multi-story government Special Access Program Facility (SAPF), the architect provided identical drawings for two three-story buildings to the security officer. One drawing is for a building on the installation to be occupied only by contracting Company X. The other is for the command headquarters building on the installation.The design reveals floor-to-ceiling windows on the second floor for the main conference rooms and front office staff. The drawings indicate a parking lot adjacent to the building separated by a four-foot-wide, handicap-accessible sidewalk. The architect placed emergency exits and stairwells at each end of the building with door hardware on the exterior to facilitate access/egress. The floor plans show interior office and conference room doors with GSA-approved locks and connectivity to the building access control badge system. The front door drawings indicate a large safety glass key lock entry door with the unit logo and designation etched in the glass. The single entry door provides access into the building lobby where visit control staff will greet people and in-process visitors. The plans identify lock boxes to be placed inside the lobby for visitors and employees to store their electronic digital devices and other prohibited items. The architect designed an open lobby leading to interior hallways, an elevator and access to the stairways. He placed the access control system central processing unit (CPU) behind the visit control desk. Typically, the CPU is located in the dispatch center. As a result, which of the following is true regarding the placement of the CPU? A. It may remain in the building lobby because the doors serve as adequate access control. B. It must be in an area designated as a Restricted Area. C. It must be in an area designated as a Sensitive Comp True - Answers True or False. Hinge pins that are located on the exterior side of emergency exit doors in the SAPF must be spot welded or have set screws installed to prevent removal of the door. C. Bollard or berm - Answers Which of the following man-made barriers could be an appropriate measure to impede vehicle passage between the parking lot and the building? A. Bollard or chain link fence B. Berm or moat C. Bollard or berm D. Berm or chain link fence The five steps in the DoD risk management model - Answers 1. Assess Assets 2. Assess Threats 3. Assess Vulnerabilities 4. Assess Risks 5. Determine Countermeasures Three core components of the risk assessment process - Answers 1. Asset criticality 2. Threat assessment 3. Vulnerability assessment Physical security survey - Answers A formal, recorded assessment of an installation's overall security program Physical security inspection - Answers A formal, recorded compliance of physical procedures and measures implemented by a unit or activity to protect its assets DoD Component Commanders - Answers Who makes the determination of when physical security surveys and inspections are required? The reason access control measures are contingent on threat levels - Answers Based on threat levels, commanders or directors are responsible for enhancing access control measure to their installations and facilities. Visitor identification control methods used to effectively control access to facilities - Answers The process to ensure only authorized personnel and materials enter and exit from an installation or facility by identifying, verifying, and authenticating. Three different types of approved classified material storage areas. - Answers 1. GSA-approved storage containers 2. Vaults (including modular vaults) 3. Open storage area (secure rooms, to include SCIFs and bulk storage areas) Construction requirements for vault doors - Answers 1. Constructed of metal 2. Hung on non-removable hinge pins or with interlocking leaves. 3. Equipped with a GSA-approved combination lock. 4. Emergency egress hardware (deadbolt or metal bar extending across width of door).

Show more Read less
Institution
SPēD SAPPC
Course
SPēD SAPPC









Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
SPēD SAPPC
Course
SPēD SAPPC

Document information

Uploaded on
April 7, 2025
Number of pages
8
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

SPēD SAPPC - PHYSEC EXAM QUESTIONS AND ANSWERS GRADED A+

B. It must be in an area designated as a Restricted Area - Answers When designing a new multi-story
government Special Access Program Facility (SAPF), the architect provided identical drawings for two
three-story buildings to the security officer. One drawing is for a building on the installation to be
occupied only by contracting Company X. The other is for the command headquarters building on the
installation.The design reveals floor-to-ceiling windows on the second floor for the main conference
rooms and front office staff. The drawings indicate a parking lot adjacent to the building separated by a
four-foot-wide, handicap-accessible sidewalk. The architect placed emergency exits and stairwells at
each end of the building with door hardware on the exterior to facilitate access/egress. The floor plans
show interior office and conference room doors with GSA-approved locks and connectivity to the
building access control badge system. The front door drawings indicate a large safety glass key lock entry
door with the unit logo and designation etched in the glass. The single entry door provides access into
the building lobby where visit control staff will greet people and in-process visitors. The plans identify
lock boxes to be placed inside the lobby for visitors and employees to store their electronic digital
devices and other prohibited items. The architect designed an open lobby leading to interior hallways,
an elevator and access to the stairways. He placed the access control system central processing unit
(CPU) behind the visit control desk. Typically, the CPU is located in the dispatch center.



As a result, which of the following is true regarding the placement of the CPU?



A. It may remain in the building lobby because the doors serve as adequate access control.



B. It must be in an area designated as a Restricted Area.



C. It must be in an area designated as a Sensitive Comp

True - Answers True or False. Hinge pins that are located on the exterior side of emergency exit doors in
the SAPF must be spot welded or have set screws installed to prevent removal of the door.

C. Bollard or berm - Answers Which of the following man-made barriers could be an appropriate
measure to impede vehicle passage between the parking lot and the building?



A. Bollard or chain link fence

, B. Berm or moat



C. Bollard or berm



D. Berm or chain link fence

The five steps in the DoD risk management model - Answers 1. Assess Assets

2. Assess Threats

3. Assess Vulnerabilities

4. Assess Risks

5. Determine Countermeasures

Three core components of the risk assessment process - Answers 1. Asset criticality

2. Threat assessment

3. Vulnerability assessment

Physical security survey - Answers A formal, recorded assessment of an installation's overall security
program

Physical security inspection - Answers A formal, recorded compliance of physical procedures and
measures implemented by a unit or activity to protect its assets

DoD Component Commanders - Answers Who makes the determination of when physical security
surveys and inspections are required?

The reason access control measures are contingent on threat levels - Answers Based on threat levels,
commanders or directors are responsible for enhancing access control measure to their installations and
facilities.

Visitor identification control methods used to effectively control access to facilities - Answers The
process to ensure only authorized personnel and materials enter and exit from an installation or facility
by identifying, verifying, and authenticating.

Three different types of approved classified material storage areas. - Answers 1. GSA-approved storage
containers

2. Vaults (including modular vaults)

3. Open storage area (secure rooms, to include SCIFs and bulk storage areas)

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
TutorJosh Chamberlain College Of Nursing
Follow You need to be logged in order to follow users or courses
Sold
359
Member since
1 year
Number of followers
16
Documents
29332
Last sold
4 hours ago
Tutor Joshua

Here You will find all Documents and Package Deals Offered By Tutor Joshua.

3,6

55 reviews

5
19
4
14
3
12
2
0
1
10

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their exams and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can immediately select a different document that better matches what you need.

Pay how you prefer, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card or EFT and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions