1. Design Phases - ANSWER ✓ Schematic Design
Design Development
Construction Document
2. Schematic Design - ANSWER ✓ Prepared for the owner, includes sketches,
graphics, logical diagrams, general design criteria and cost estimates
3. Design Development - ANSWER ✓ After schematic designs approved by
owner, design team begins design development
Includes outline, specs, drawing and cost estimates
4. Formal reviews begin at what percentage of design development -
ANSWER ✓ 50 and 80
5. Construction Documents - ANSWER ✓ After owner approves DD, design
team prepares ___________ __________, which are used to obtain pricing
of required work
6. Owner Bidding Role - ANSWER ✓ Supplies bidding and contracting
requirements, sends invites to prospective bidders
7. Design Team Bidding Role - ANSWER ✓ Produce any Addenda based on
the QBD
,8. Construction Manager Bidding Role - ANSWER ✓ May lead or participate
in bid process
9. General Contractor Bidding Roles - ANSWER ✓ Prepare and submit their
bids to the owner
10.Contractor, Subcontractor Bidding Roles - ANSWER ✓ Prepare and submit
their bids to the General Contractor
11.Types of Bid Structures - ANSWER ✓ RFP
RFQ
DBB
DB
CMAR
IPD
12.Request for Quotation (RFQ) - ANSWER ✓ A type of procurement
document used to request price quotations from prospective sellers of
common or standard products or services. Sometimes used in place of
request for proposal and, in some application areas, it may have a narrower
or more specific meaning.
13.Design-Bid-Build (DBB) - ANSWER ✓ Owner contracts with separate
design and construction team for a project.
1). Design - Design team works directly for Owner
2). Bid - Owner solicits docs for bid by contractor, review and award
contract
3). Build - Construction Design team oversees construction
14.Design-Build (DB) - ANSWER ✓ Delivery method whereby the owner
contacts with a single entitiy
Construction and Design phases are overlapping
15.Who does the design professional work for in Design Build - ANSWER ✓
General Contractor
16.Who is included in the Design Build Team? - ANSWER ✓ General
Contractor
, Subcontractor
Design Professional
17.Consruction Manager at Risk (CMAR) - ANSWER ✓ Delivery method
where CM contracts to deliver project within a Guaranteed Maximum Price
(GMP)
18.Integrated Project Delivery (IPD) - ANSWER ✓ Delivery method that
organizes project team, integrates all aspects of a design and construction
team to a single team effort
19.Which individuals make up the IPD? - ANSWER ✓ Owner
Design Professional
Contractor
20.Types of Bids - ANSWER ✓ Low
Negotiated
21.in the United States, bidding laws often require the
mechanical, plumbing, and electrical portions of the work to be bid and
contracted separately
from the general construction contract - ANSWER ✓ Multiple prime bid or
filed sub-bid.
22.Prime Contractor - ANSWER ✓ Contractor who is awarded the contract
23.Owners Role During Construction Phase - ANSWER ✓ Make payments to
contractor
24.Owner can at any time of the project - ANSWER ✓ Stop work
Complete any uncompleted work
Clean the site
Partially occupy the building
Terminate without clause
25.Design Team's Role During Construction - ANSWER ✓ Inspect and observe
contruction
Design team review submittals
, Submit change orders, (modify any contract docs)
26.Construction Manager's Role During Construction - ANSWER ✓
Coordinates construction
In charge of access, safety, storage of materials
27.General Contractor and Subcontractor's Role During Construction -
ANSWER ✓ Complete Work
28.Who is Responsible for Acquiring Permits - ANSWER ✓ General
Contractor and Subcontractor
29.Who is Responsible for Test Results - ANSWER ✓ General Contractor and
Subcontractor
30.Who is Responsible for Submittals - ANSWER ✓ General Contractor and
Subcontractor
31.Who is Responsible for Maintaning a Safe Work Environment During
Construction - ANSWER ✓ General Contractor and Subcontractor
32.Who is Responsible for Completing Punch List - ANSWER ✓ General
Contractor and Subcontractor
33.Types of Contracts - ANSWER ✓ Stipulated Sum
Cost Plus Fee
Unit Price
34.Stipulated Sum - ANSWER ✓ Contractor submits a fixed price for SoW,
Mostly Low Bids, can be negotiated
35.Cost Plus Fee - ANSWER ✓ Contractor is reinbursed for the actual costs
plus a fee. May be required to submit a GMP
36.Unit Price - ANSWER ✓ Used to obtain pricing when SoW has not been
completed