100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

CQM for USACE QUESTIONS AND ANSWERS ACCURATE

Rating
-
Sold
-
Pages
5
Grade
A+
Uploaded on
01-04-2025
Written in
2024/2025

Exam of 5 pages for the course CQM-C at CQM-C (CQM for USACE)

Institution
CQM-C
Course
CQM-C









Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
CQM-C
Course
CQM-C

Document information

Uploaded on
April 1, 2025
Number of pages
5
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

CQM for USACE

Construction quality management - answer The performance of tasks, which ensure
that construction is performed according to plans and specifications, on time, within a
defined budget, and a safe work environment.

Quality - answer Conformance to properly developed requirements

Purpose of CQM - answer The government's efforts, separate from, but in coordination
and cooperation with the contractor, assure that the quality set by the plans and
specifications is achieved.

Contractor quality control function - answer To assure that the completed project meets
all quality requirements of the contract.

Contractor benefits of CQM - answer Increased profit and production, better
communications, planning, improved organizational skills, and outstanding performance
evaluations to obtain future contracts.

Two factors cause construction industry to become highly specialized - answer
Changing market and increased tech and regulations

Factors that will influence both the govt and construction industry in the future -
answerNew govt regulations, greater influence from customer, improvement of QC and
QA requirements, construction-oriented mgmt info systems, formal partnering involving
stakeholders, more reliance on design-build, more consideration for life cycle
requirements, increased performance based incentives

Pre construction submittals - answerRequired prior to or at start of construction or the
next major phase on a multi phase contract

Preconstruction submittals include: - answerScheduled and a tabular list of locations,
features, and other pertinent information regarding products, materials, equipment, or
components to be used in work

Product data - answerCatalog cuts, illustrations, schedules, diagrams, performance
charts, instructions, systems and equipment

Samples - answerFabricated or I fabricated physical examples of materials, equipment,
or workmanship that illustrate functional and aesthetic characteristics of material or
product that establish standards

Design data - answerCalculations, mix designs, analyses pertaining to a part of work

, Test reports - answerSigned by authorized official of laboratory that a material, product
or system to be provided has been tested in accord with specified requirements, unless
otherwise specified, must have been done within 3 years of date of contract award

Certificates - answerStatements printed on the manufacturer's letterhead and signed by
responsible officials of manufacturer's product, system, or material meets spec
requirements. Must be dated after award of project contract and clearly name the
project

Manufacturer's instructions - answerPreprinted material describing installation of a
product, system, or material, including special notices and concerning impedances,
hazards, and safety instructions

Operation and maintenance data - answerData provided by the manufacturer, or system
provider, including help and product line documentation, necessary to maintain and
install equipment for operating and maintenance use

Manufacturer's field reports - answerDocumentation of the testing and verification
actions taken by manufacturer's representative at the job site, or on sample taken from
the job site, on a portion of the work, during or after installation to confirm compliance
with standards and instructions.

Must be signed by an authorized official of testing laboratory or agency and state the
test results to indicate pass or failure

Closeout Submittals - answerDocumentation to record compliance with technical or
administrative requirements or to establish an administrative mechanism

Special requirements to end a contract or major phase if a multi phase contract

GPV - answerGuiding principle validation

TPC - answerThird party certification

Approving Authority - answerOffice or designated person authorized to approve
submittal

Work - answerOn and off site construction required by contract documents, including
labor necessary to produce submittals, construction, materials, products, equipment,
and systems incorporated or to be incorporated

Submittals - answerare NOT contract documents. Prepared by subcontractors and
material suppliers, sent to GC to review and approve them, which means the GC has
varified field measurements, materials have been checked and construction criteria has
been coordinated. Then- the submittals are sent to Designer (if the submittals are NOT
R241,78
Get access to the full document:

100% satisfaction guarantee
Immediately available after payment
Both online and in PDF
No strings attached


Document also available in package deal

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
julianah420 Phoenix University
Follow You need to be logged in order to follow users or courses
Sold
655
Member since
2 year
Number of followers
324
Documents
33814
Last sold
1 day ago
NURSING,TESTBANKS,ASSIGNMENT,AQA AND ALL REVISION MATERIALS

On this page, you find all documents, package deals, and flashcards offered by seller julianah420

4,3

149 reviews

5
101
4
20
3
8
2
5
1
15

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their exams and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can immediately select a different document that better matches what you need.

Pay how you prefer, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card or EFT and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions