answers latest
top score
What fittings are secured for CBR defense? - correct answer. Circle William
What condition of readiness is used when the ship is in NO danger? - correct
answer. X- ray
The maximum length of time that a fitting may be logged open is ....... -
correct
answer. 24 hours.
The backbone of a ship is referred to as the ....... - correct answer. keel.
Compartments located completely on the Starboard side of the centerline are
assigned
....... numbers as the third digit in a compartment number. - correct answer.
odd
The lettering on a compartment BULL'S EYE is ....... inches tall? - correct
answer. 2
Primary monitoring of the firemain system is conducted from ....... - correct
answer. Damage Control Central
Which type of fire main system is located near the centerline of the ship that
extends forward and aft on the damage control deck to supply the required
fire main services? - correct answer. Single Main
What is the proper sequence to align an installed eductor for operation? - correct
answer. Discharge valve, fire main actuation valve, bilge suction valve
Which drainage system runs through the main machinery spaces on a Navy
ship? - correct answer. Main
(True/False) To prevent possible flooding in the compartment, the bilge
, suctions must be closed at all times when NOT in use. - correct answer. True