Technician
A
Practice
VI
TU
Questions with
IS
well explained
M
O
Answers 100%
A
N
JP
, Type A Fire Extinguisher - ANSWER Puts out paper, wood, cloth, rubbish fires.
Type B Fire Extinguisher - ANSWER Puts out flammable and combustible liquids.
Type C Fire Extinguisher - ANSWER Puts out electrical fires.
According to CCR, Title 23 UST Regulations, what is the frequency that the monitor
system certification must be performed? - ANSWER 12 month
A
If visual monitoring is utilized as the means of release detection for a single walled tank,
VI
it must be conducted on a _____ basis. - ANSWER daily
The purpose of spill and overfill protection equipment is to minimize the potential for a
TU
release during _____. - ANSWER fuel deliveries
Which of the following is a potential symptom of toxic petroleum exposure?
IS
a. dizziness
b. tremors
c. eye irritation
d. all the above - ANSWER d. all the above
M
Under-dispenser containment is required for _____ underground storage tank systems.
O
- ANSWER all
All of the following are true for Automatic Tank Gauging except for...
A
a. ATG system consists of a probe installed in a tank
N
b. ATG systems are required to be installed in all UST systems
c. ATG systems have a control panel that can provide information on product level and
JP
temperature
d. ATG systems can be programmed to calculate the changes in product volume to
determine if a tank is leaking - ANSWER b. ATG systems are required to be
installed in all UST systems
According to CCR Title 23, UST regulations, spill containment must meet all of the
following requirements except:
a. be installed on vent risers