,ug/g - ANSWER microgram per gram
ug/ft2 - ANSWER microgram per foot square (dust sampling)
mg/cm2 - ANSWER milligrams per centimeter squared (XRF)
ug/dL - ANSWER microgram per deci-liter
A
ug/m3 - ANSWER microgram per deci-liter (quantity in blood)
VI
1% - ANSWER 10,000 ppm
TU
Allowed quantity of lead in dry surface paint when testing with XRF. - ANSWER 1.0
mg/cm2
Allowed quantity of lead in dry surface paint when testing with paint chip - ANSWER
5000 ppm
IS
Allowed quantity of lead in dry surface paint by weight - ANSWER .5% = 5000ppm
M
Lead Quantities for Dust Clearance from floors/carpet - ANSWER 40 ug/ft2
O
Lead Quantities for Dust Clearance from furniture - ANSWER 40 ug/ft2
Lead Quantities for Dust Clearance from window sills - ANSWER 250 ug/ft2
A
Lead Quantities for Dust Clearance from window wells - ANSWER 400 ug/ft2
N
Lead Quantities for Dust Clearance from outside concrete - ANSWER 800 ug/ft2
JP
Lead Quantities for Soil Clearance in contact areas - ANSWER 400 ppm
Lead Quantities for Soil Clearance in non-contact areas - ANSWER 1200 ppm
Allowable lead quantity in water - ANSWER 15 ppb/liter, or 15 mgL
Lead blood level of concern for children - ANSWER 5 ug/dL
, NIOSH Lead blood level of concern - ANSWER 25 ug/dL
OSHA employee lead blood level of concern - ANSWER 40 ug/dL
OSHA medical removal lead blood level - ANSWER 50 ug/d?
Lead Paint 1978 level allowed - ANSWER .06%; 600 ppm
Current level lead allowed in paint - ANSWER .009%; 90 ppm
A
Lead Paint allowed in all other consumer products - ANSWER .01%; 100 ppm
VI
Hazardous Waste Toxic Characteristic Leaching Procedure (TCLP) - ANSWER 5
ppm
TU
The use of lead based paint exceeding .06% was banned - ANSWER in 1978 for
residential housing.
T/F the concentration of lead paint in deteriorating housing must be greater than 1
IS
mg/cm2 by XRF to pose a threat to workers doing renovation or abatement practices. -
ANSWER False
M
Title X does not apply to; - ANSWER bridges and steel structure; hotels and motels
rented less than 100 days and commercial complexes.
O
What is the primary objective of a Lead Paint Risk Assessment? - ANSWER to
discover lead hazards
A
What is the primary objective of a Lead Paint Inspection? - ANSWER to discover
N
lead paint
JP
TSCA Title IV, Section 402/404 Rule directed EPA to; - ANSWER develop training
and certification requirements for lead professionals. Individuals performing inspections
and risk assessments for lead hazards must be certified through the EPA accredited
program
T/F EPA's debris rule advises contractors that lead waste generated during renovation
and remodeling of residential housing is now waived from RCRA's rule and can be
disposed of as municipal waste - ANSWER True