What two types of Estimates are needed to pay for the work performed by contractors? - CORRECT ANSWER-Final & Progress Monthly In case of discrepancies among the contract documents, which document takes the highest precedence? - CORRECT ANSWER-Special Provisions Contractors Recieve progress payments on the basis of? - CORRECT ANSWER-Monthly Progress Estimates Which of the following sets forth the Department's methods and procedures for preparing and checking final estimates? - CORRECT ANSWER-Preparation and Documentation Manual (PDM) Which Document contains a series of Specially designed forms that show both original estimates of quantities and the final quantities as measured ad accepted? - CORRECT ANSWER-Computation Books Which Document contains alignment notes, cross-section notes, linear and area measurements and dimension sketches? - CORRECT ANSWER-Field Notebooks Where are major changes during construction documented and "as-built" conditions shown? - CORRECT ANSWER-Field Notebooks What identification is needed to show on the front cover of a field book? - CORRECT ANSWER-FEID, Contract number, General contents of the book

Show more Read less
Institution
FDOT - Level 1
Course
FDOT - Level 1









Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
FDOT - Level 1
Course
FDOT - Level 1

Document information

Uploaded on
February 24, 2025
Number of pages
6
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

FDOT Final Estimates - Level 1 Exam
Questions With Complete Solutions
Graded A+

What two types of Estimates are needed to pay for the work performed by contractors?
- CORRECT ANSWER-Final & Progress Monthly



In case of discrepancies among the contract documents, which document takes the
highest precedence? - CORRECT ANSWER-Special Provisions



Contractors Recieve progress payments on the basis of? - CORRECT ANSWER-
Monthly Progress Estimates



Which of the following sets forth the Department's methods and procedures for
preparing and checking final estimates? - CORRECT ANSWER-Preparation and
Documentation Manual (PDM)



Which Document contains a series of Specially designed forms that show both original
estimates of quantities and the final quantities as measured ad accepted? - CORRECT
ANSWER-Computation Books



Which Document contains alignment notes, cross-section notes, linear and area
measurements and dimension sketches? - CORRECT ANSWER-Field Notebooks



Where are major changes during construction documented and "as-built" conditions
shown? - CORRECT ANSWER-Field Notebooks

, What identification is needed to show on the front cover of a field book? - CORRECT
ANSWER-FEID, Contract number, General contents of the book



When making corrections to a field book entry, you should: - CORRECT ANSWER-
strike through, initial and enter correct data and date



What should be started on the first lined page (page 1) of a field book? - CORRECT
ANSWER-INDEX



An entire page of a field notebook you are using is incorrect, what do you do to correct
the situation? - CORRECT ANSWER-Mark the page VOID and reference it to a new
page showing the correct information.



"Check Levels" must be run at the start of a construction project to assure that: -
CORRECT ANSWER-Construction will be done to design elevations & final
measurements for payment will be from the same base elevations as the original
survey.



What should accompany final measurements so that nonstandard measurements may
be interpreted accurately? - CORRECT ANSWER-Sketches



In the REMARKS column of most computation book forms a reference should be made
to the: - CORRECT ANSWER-Source Documents



When is it permissible to record only the net weight on an asphaltic concrete tabulation
form? - CORRECT ANSWER-Never, gross tare must be included also



A limerock base course is constructed in two 13-foot widths between station 19+40.20
and station 84+50.00. What is the area of the base course to the whole square yard? -
CORRECT ANSWER-18,806 SY
R183,45
Get access to the full document:

100% satisfaction guarantee
Immediately available after payment
Both online and in PDF
No strings attached


Document also available in package deal

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
remojudytask Chamberlain College Of Nursing
Follow You need to be logged in order to follow users or courses
Sold
82
Member since
2 year
Number of followers
30
Documents
3120
Last sold
5 days ago

3,2

25 reviews

5
6
4
3
3
11
2
0
1
5

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their exams and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can immediately select a different document that better matches what you need.

Pay how you prefer, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card or EFT and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions