100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4,6 TrustPilot
logo-home
Exam (elaborations)

ACI WRITTEN EXAM QUESTIONS AND ANSWERS

Rating
-
Sold
-
Pages
9
Grade
A+
Uploaded on
11-09-2024
Written in
2024/2025

ACI WRITTEN EXAM QUESTIONS AND ANSWERS

Institution
ACI
Course
ACI









Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
ACI
Course
ACI

Document information

Uploaded on
September 11, 2024
Number of pages
9
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

ACI WRITTEN EXAM QUESTIONS AND ANSWERS

The sensor of the temperature measureing device shall be submerged a minimum of
____ in - Answers -3 (75mm)

The temperature measureing device shall have a capacity of measuring temperature of
freshly mixed conrcrete to +-_____ degrees F throught a range of _____ - Answers -
1(.5 degrees C), 30-120 (0-50 degrees C)

The temperature measuring device shall be calibrated____, or whenever there is a
question of _____ - Answers -annually, accuracy

The temp of concrete may be measured in a wheelbarrow - Answers -true

the temp of concrete may be measured in a wall form - Answers -true

A composite sample of concrete is required even if the only purpose for obtaining the
sample is to determine temp. - Answers -false

What must be done to the sample container prior to sampling the concrete - Answers -
dampen (with water)
the molding of strength test specimens shall begin within ____ minutes after fabricating
the composite sample - Answers -15

The concrete sample must be protected from contamination and ____ - Answers -rapid
evaporation

The minimum size sample test specimen is - Answers -28 L (1ft^3)

when sampling from a stationary mixer the batch must be sampled at _____ or more
regularly spaced intervals during discharge of the middle portion of the batch - Answers
-2

The composite sample for a paving mixer must represent a minimum of _____ different
portions of the batch of concrete taken from the pile after discharge - Answers -5

When sampling from a revolving drum truck mixer, concrete must be sampled at a
minimum of ______ regularly spaced intervals during discharge of the middle portion of
the batch - Answers -2

Concrete samples from a truck mixer must be obtained before any water or admixtures
are added to the mixer at the job site - Answers -False

The composite sample from a truck mixer must be obtained from the _____ portion of
the batch - Answers -Middle

, When the concrete contains aggregate larger than permitted for a particular test
method, the sample fo concrete must be ______ ______ before making the test -
Answers -Wet Sieved

The slump test is applicable to plastic concrete with a max aggregate size of ____ in -
Answers -1.5 in (37.5 mm)

When concrete contains aggregate larger than allowed for the slump test the large
aggregate must be - Answers -removed by wet sieving the sample over 1.5 in sieve

The mold for making the slump test is the shape of - Answers -the frustum of a cone

The height fo the slump mold is _____ in - Answers -12

The interior surface of the slump mold is allowed to have minor irregularities - Answers -
false

For use in the slump test, the end or both ends of the tamping rod must be - Answers -
rounded

the sample of concrete for use in making the slump test must be obtained in accordance
with ASTM standard ________ - Answers -C172 (Standard Practice for sampling freshly
mixed concrete

The slump mold should be in a dry condition before the beginning of the test - Answers -
false

the surface on which the slump mold will be placed must be _____ - Answers -flat, level
moist, nonabsorbent, free of vibration

The slump mold is filled in ____ layers - Answers -3

what must be done to the concrete surrounding the temp measuring device after the
device has submerged - Answers -Press concrete around measuring device

How long must the temp device remain in the concrete - Answers -at least 2 minutes
(but no more than 5)

After temp of concrete is read, what then is required - Answers -reporting of temp

the temp of concrete to be measured to the nearest ____degree F - Answers -1 (.5
degree C)

According to the ASTM C1064 what is one reason to take the temp of concrete -
Answers -verify conformance to a specified requirement for temp

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
GEEKA YALA UNIVERSITY
Follow You need to be logged in order to follow users or courses
Sold
2015
Member since
3 year
Number of followers
1447
Documents
48906
Last sold
2 days ago

3,8

345 reviews

5
172
4
61
3
44
2
16
1
52

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their exams and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can immediately select a different document that better matches what you need.

Pay how you prefer, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card or EFT and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions