INTERCONNECTION RELIABILITY OPERATIONS AND COORDINATION EXAMS WITH ACTUAL CORRECT QUESTIONS AND VERIFIED DETAILED ANSWERS ALREADY GRADED A+ GUARANTEED PASS

Institution
INTERCONNECTION
Course
INTERCONNECTION









Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
INTERCONNECTION
Course
INTERCONNECTION

Document information

Uploaded on
August 11, 2024
Number of pages
14
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

INTERCONNECTION RELIABILITY
OPERATIONS AND COORDINATION
EXAMS WITH ACTUAL CORRECT
QUESTIONS AND VERIFIED
DETAILED ANSWERS ALREADY
GRADED A+ GUARANTEED PASS



The RC shall know the current status of all _______ in their whose failure, degradation or disconnection
could result in a system operating limit or an interconnection reliability operating limit violation

Since events in one part of the system can influence operations in all other parts of the system, the RC is
required to monitor and determine any potential SOL and IROL violations

True

Once a Reliability Coordinator issues a directive to preserve the integrity and reliability of the Bulk
Electric System, actions shall be taken without delay, but no longer than ________.

30 minutes

Reliability Coordinator shall initiate control actions or emergency procedures to relieve the violation
without delay and no longer than ___________.

30 minutes

___________ have the duty to continuously assess transmission reliability and coordinate emergency
operations among the operating entities within the region and across the regional boundaries.

Reliability Coordinators

, A portion of a Reliability Coordinator Area is experiencing low voltage, what directives should the
Reliability Coordinator give?

Lower transfers across area and increase generation in area with low voltage

Low voltage is a result of reactive power and losses associated with transferring power to load areas.
Increasing generation in the area with low voltage reduces losses associated with transferring power.

At any time, regardless of prior planned or unplanned events, the Reliability Coordinator should be able
to determine any potential ______________ violations within its Reliability Coordinator Area.

System Operating Limits (SOL) & Interconnection Reliability Operating Limits (IROL)

The _______ as defined by NERC is the electrical generation resources, transmission lines,
interconnections with neighboring systems, and associated equipment, generally operated at voltages
of 100 kilovolts or higher.

Bulk Electric System

Each Reliability Coordinator shall have adequate analysis tools, such as state estimation, contingency
analysis capabilities and ________ to monitor the Bulk Electric System.

wide-area overview displays

Wide-Area view is required therefore, each Reliability Coordinator shall have adequate analysis tools;
such as, state estimation, pre- and post-contingency analysis capabilities (thermal, stability, and
voltage), and wide-area overview displays.

This is stated in the NERC Standard IRO-002 explicitly and applied in the NERC Standard IRO-003 as the
RC shall monitor a wide area view within its Reliability Coordinator Area and that of neighboring
Reliability Coordinators.

Reliability Coordinators that delegate tasks to other entities shall have formal operating _________ with
each entity to which tasks are delegated.

agreements

If Reliability Coordinator tasks are delegated to other entities, the Reliability Coordinator shall verify that
these tasks are carried out by ___________ operating personnel.

NERC certified

Reliability Coordinators shall have clear, comprehensive coordination agreements with adjacent
Reliability Coordinators to ensure that System Operating Limit or Interconnection Reliability Operating
Limit violation mitigation requiring actions in adjacent Reliability Coordinator Areas are __________.

coordinated

Once a Reliability Coordinator issues a directive to preserve the integrity and reliability of the Bulk
Electric System, actions shall be taken without delay, but no longer than ________.
R270,80
Get access to the full document:

100% satisfaction guarantee
Immediately available after payment
Both online and in PDF
No strings attached

Get to know the seller
Seller avatar
drjulie
1,0
(1)

Get to know the seller

Seller avatar
drjulie john hopkins university
Follow You need to be logged in order to follow users or courses
Sold
8
Member since
1 year
Number of followers
2
Documents
593
Last sold
10 months ago
perfect grades

Quality over Quantity : i am strong believer in quality and reliable educational journey and therefore offer high -quality study docs ,comprehensive resources in variours subjects .meticulously curated ,accurate ,clear, and affordable .update reguarly. Download for excellence .Good luck and all the best .You got this DO NOT HESISTATE TO CONTACT FOR HELP . I WILL BE MORE THAN GLAD TO HELP

1,0

1 reviews

5
0
4
0
3
0
2
0
1
1

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their exams and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can immediately select a different document that better matches what you need.

Pay how you prefer, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card or EFT and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions