Boilermaker test UPS || correct answers.
When working on an exchanger tube side hydro test, the correct answers CHANNEL HEAD How many bolts need to be removed from a 12 bolt flange when installing gasket? correct answers 5 One of the main factors to consider when installing an orifice plate is: correct answers Direction of flow When cutting a stud bolt, which end of the bolt should be saved? correct answers - STAMPED - STENCILED - MARKED The method of pulling and rigging out an exchanger bundle without equipment is called a CONVENTIONAL pull. correct answers - TRUE One of the most common internal components used to slow the f called a. DEMISTER_ pad. correct answers - TRUE Bundle straps should be aligned with the exchanger bundle BAFFLE plate when rigging an correct answers - TRUE SOFTENERS.. should be put into place when chokers come into contact with sharp surfaces or edges. correct answers - TRUE What are the two different classifications of manways on towers? correct answers - INTERNAL - EXTERNAL Which exchanger head is always absent on a u-tube bundle? correct answers FLOATING HEAD A pipe union has a flow direction. correct answers - TRUE To properly install an exchanger head and make sure the gasket seats properly you should: correct answers Glue gasket to the proper gasket surface, where the gasket will catch ou that gasket surface preventing it from rolling By order of hitch strength, which is the correct order (strongest to weakest) correct answers Basket, vertical, choke You should first a spring can before removing any piping or equipment correct answers CHOCK Who gives the crane operator hand signals when performing a lift? correct answers THE PERSON ASSIGNED PRIOR TO THE UFT
Written for
- Institution
- Boiler
- Course
- Boiler
Document information
- Uploaded on
- June 19, 2024
- Number of pages
- 2
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
-
when working on an exchanger tube side hydro test
Document also available in package deal