Walmart - Stormwater Top Grade A+.
Groundcover Temporary stabilization should be implemented Immediately on all disturbed areas that are likely to or will remain inactive for 14 days or more The primary purpose of a construction exit is To remove sediment from construction site vehicles and minimize track out Common types of erosion include all of the following except Sedimentation Which of the following is NOT a beneficial use of water? Flushing a spill down a storm drain When installing and maintaining a check dam make sure: The low point (overflow) of the check dam is in the middle of the channel To reduce the possibility of undercutting in channels, you should: Install filter fabric under a rock and similar materials placed within the stormwater The good housekeeping section of the SWPPP must include all BUT which of the following Post-construction stormwater management procedures
Written for
- Institution
- Walmart - Stormwater
- Course
- Walmart - Stormwater
Document information
- Uploaded on
- May 28, 2024
- Number of pages
- 2
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
-
walmart stormwater top grade a
-
the 1970s law that set into place the regulation o