ACI Concrete Field-Testing Technician - Grade I | 100% Correct Answers | Verified | Latest 2024 Version
The end of the temperature sensing portion of the temperature measuring device is submerged a minimum of __mm [__in.] into the freshly mixed concrete. - 77mm /3in. The temperature measuring device shall be capable of accurately measuring the temperature of freshly mixed concrete to +- __C [+__F] throught a range of __. - 0.5 C / +-1F / 0-50 Decrees C The temp. measuring device shall be verified __, or whenever there is a question of __. - Annually / accuracy The temp of concrete may be measured in a wheelbarrow? T/F - True The temp. of concrete may be measured in a wall form. T/F - True A composite sample of concrete is required even if the only purpose for obtaining the sample is to determine temp. T/F - False What must be done to the sample container prior to sampling the concrete - It must be dampened with water What must be done to the concrete surrounding the temp measuring device after the device is submerged in the fresh concrete? - Gently press the concrete at the surface around the measuring device.
Written for
- Institution
- ACI Concrete Field-Testing Technician
- Course
- ACI Concrete Field-Testing Technician
Document information
- Uploaded on
- May 7, 2024
- Number of pages
- 6
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
-
aci concrete field testing technician grade i
Document also available in package deal