Industrial Storm Water Certified Operator Training exam questions fully solved & updated 2024
Under natural conditions, the majority of rain water that falls to the ground ____________ infiltrates the ground or evaporates The introduction of pollutants to storm water most commonly occurs when industrial facilities allow operating procedures and industrial materials to _________________ become exposed to storm water The best way to prevent contamination of storm water is __________ through pollution prevention The highest percentage of pollutants in storm water runoff occurs in the first few minutes that storm water runs off. This is called the ________ first flush Organic enrichment of storm water runoff from sources such as food processing, airport deicing, antifreezes, and sewage create addition oxygen demand in lakes and streams. Much of the demand is due to bacteria feeding on these materials. The increased oxygen demand can lead to __________, which is a common cause of fish kills. oxygen depletion The addition of nitrogen and phosphorus to storm water runoff can result in algal blooms and excessive growth of aquatic plants in fresh water systems such as lakes and streams. In fresh water systems ___________ is the main cause of excessive plant and algal growth. phosphorus Sediment is one of the most widespread pollutants in surface water. Many ________ attach to finer sediment particles. Sediment can also be destructive to aquatic systems by covering and damaging habitat. pollutants Michigan law requires that anyone who discharges liquid wastes to surface waters of the state must have their pollution control measures under the supervision of a __________________________ Certified Operator If there is a construction activity at an industrial facility that disturbs one or more acres of land or the soil disturbance is within 500 feet of a water body, the owner of the property will need to apply for a __________________________________________ permit. In addition if the soil disturbance will become 5 or more acres in size the property owner will need to submit the Notice of Coverage application to the EGLE, Water Resources Division. Soil Erosion and Sedimentation Control _________________ permits are not site specific and contain the minimum requirements for protecting water quality. General The _______________________________ is a document that authorizes the discharge of storm water under a general storm water permit. Certificate of Coverage ________________ permits are site specific and contain requirements such as regular sampling, monitoring, end of pipe treatment or effluent limits. Individual There are two type of industrial storm water general permits in Michigan; they are Storm Water from Industrial Activity and Storm Water with ________________________ Required Monitoring or Special Use Areas A facility that has the industrial storm water general permit with required monitoring or special use areas is required to conduct a ________________________________________ Short Term Storm Water Characterization Study An annual fee will be assessed to all facilities that have permitted storm water discharges. All facilities that have authorization to discharge storm water on _________________ will be responsible for the annual fee January 1 Industrial facilities are identified in the federal storm water regulations by ____________________________ and narrative description. Standard Industrial Classification (SIC) Code The surface water that receives the point source of discharge is called the ___________________. This information must be included on the Notice of Intent (NOI) application when applying for the storm water discharge coverage. receiving waters Surface waters of the state include ________, _________, _______, and __________. rivers, lakes, streams, wetlands a ________________________ is any discernible, confined, and discrete conveyance that discharges storm water into surface waters. Examples include, but are not limited to, pipes, ditches, channels, tunnels, conduits, or anything that conveys storm water into surface waters. point source discharge A discharge point that directs waste water, including storm water to a storm sewer is called a/an ______________________ point of discharge A discharge point that directs waste water, including storm water to surface waters of the state is called a/an ______________________ outfall A sewer system in which the storm water is kept separate from sanitary sewage and discharges directly into a surface water body is called a __________________________ Separate Sewer System A sewer system in which the sanitary sewage and the storm water are combined and are directed to a wastewater treatment plant is called a ________________________ Combined Sewer System For industrial facilities that are regulated by the federal regulations and there is a point source discharge, but there is no exposure of industrial materials, the no exposure certification must be submitted every _____________ in MiWaters. 5 years The application for storm water permit coverage must be signed by the __________________________ Principal executive officer or designee ____________________ is a state-of-the-art, comprehensive, web-based permitting and compliance database. MiWaters The focus of MiWaters is _________ and _____________ permitting and compliance
Written for
- Institution
- Stormwater management
- Course
- Stormwater management
Document information
- Uploaded on
- April 28, 2024
- Number of pages
- 17
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
-
industrial storm water certified operator training
Document also available in package deal