SSOP QUESTIONS WITH 100 % CORRECT ANSWERS | VERIFIED
Established procedures are defined as approved written "blank" from higher authority. - Answer-Instructions Which core principles is to take ownership of your watchstation regardless of rate or rank. - AnswerQuestioning attitude Communication up and down the chain of command is important regardless of rank. - Answer-forceful backup Verbatim repeat backs which limit the potential for? - Answer-Misinterpretation stopping an unsafe act you just happen to be walking by when It would be just as easy to ignore it and keep going. Is an example of what core principle - Answer-forceful what core principle is an example of well trained and disciplined operators follow procedures troughfully nice friendly and understand the expected system response when taking an action - Answer-level of knowledge the navy expects you to do the right thing every time - Answer-even when no one is watching when preforming ORM what should you ask yourself - Answer-what could go wrong here problems with the orientation and materials condition must first be reported to the "blank" - Answeroperational Engineering and bridge logs must be? - Answer-Chronological placing an alarm of warning in cutout. except for pms of an approved procedure can only be authorized by the? - Answer-COany material that is not properly stowed becomes a? - Answer-Missle hazard "blank" should have a deck of msds at the work center , assemble by all maintenance personal - Answerworkcenter superviser list of equipment and systems that are out of commission or have units that restrict their operation - Answer-Eight O clock reports notify supervisors when space temp is over "Blank" if you are on watch for less than 5 hours, and if temp over "Blank" for watch over 5hours - Answer-100F & 90F what are one of the supporting processes - Answer-ORM operational risk management Successful supervisors and operators understand the principle and ensure procedures are? - Answerreadily available, frequently referenced and strictly adhered to the routine in day to day operations is - Answer-point, read, pause, and operate
Written for
- Institution
- SSOP
- Course
- SSOP
Document information
- Uploaded on
- April 14, 2024
- Number of pages
- 3
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
-
ssop
Document also available in package deal