100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

ACQ 101 module 6 Work Breakdown Structure WBS Questions and Answers Rated A+

Rating
-
Sold
-
Pages
5
Grade
A+
Uploaded on
04-04-2024
Written in
2023/2024

The DoD provides guidance for the development of a standardized WBS. The principal document that describes these structures is derived from which of the following? MIL-STD881C The principal document that the DoD employs in developing and standardizing WBS is the "DoD standard practice work breakdown structures for defense materiel items." In the document, how many types of systems are covered? 11 eleven What are the common elements of WBSs? integration, assembly, test and checkout; systems engineering; program management; training; data; system test and evaluation; peculiar support equipment; common support equipment; operation and site activation; industrial facilities; initial spares and repair parts. Which of the following is referred to as the "product part" of a WBS? system elements The common elements of a WBS are elements common to all acquisition programs developed by the DoD. Common elements can be found at all levels of a WBS. They are the actual configuration items of

Show more Read less
Institution
ACQ 101 Module 6
Course
ACQ 101 module 6









Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
ACQ 101 module 6
Course
ACQ 101 module 6

Document information

Uploaded on
April 4, 2024
Number of pages
5
Written in
2023/2024
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

ACQ 101 module 6 Work Breakdown Structure WBS Questions and Answers Rated A+ DoD components and contractors use WBSs as a foundation to establish schedules and formulating budgets. ✔✔True The DoD provides guidance for the development of a standardized WBS. The principal docu ment that describes these structures is derived from which of the following? ✔✔MIL-STD -
881C The principal document that the DoD employs in developing and standardizing WBS is the "DoD standard practice work breakdown structures for defense materiel items. " In the document, how many types of systems are covered? ✔✔11 eleven What are the common elements of WBSs? ✔✔integration, assembly, test and checkout; systems engineering; program management; training; data; system test and evaluation; peculiar support equipment; common support equipment; operation and site activation; industrial facilities; initial spares and repair parts. Which of the following is referred to as the "product part" of a WBS? ✔✔system elements The common elements of a WBS are elements c ommon to all acquisition programs developed by the DoD. Common elements can be found at all levels of a WBS. They are the actual configuration items of the system, and enable the realization of the system. ✔✔false; common elements can be found at all level s of a WBS. They are the enabler for the system realization. They are applicable to all major systems and subsystems as needed. They are NOT the actual configuration items of the system, but elements that enable the realization of the system. Program WBS is controlled and maintained by? ✔✔program management office PMO Contract WBS is controlled and maintained by? ✔✔the contractor WBS Level 3 elements are subordinate elements of each Level 2 major element. Which of the following are identified as level 3 elements? ✔✔fire control type of service; technical publication The Program WBS has 3 levels; what are they and what do they cover? ✔✔Level 1 is the entire aircraft system; Level 2 covers the prime mission products including the aircraft system hardware a nd software and includes the aggregations of system -level services such as program
R146,68
Get access to the full document:

100% satisfaction guarantee
Immediately available after payment
Both online and in PDF
No strings attached


Document also available in package deal

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
GONZOGEEK University Of Texas - Austin
Follow You need to be logged in order to follow users or courses
Sold
12
Member since
2 year
Number of followers
8
Documents
1257
Last sold
2 months ago
CREME DE LA CREME 1

Better ways to find bargain academic materials for effective pursuing of better grades . With effective passing rates . Ditch the rigid semester structure. Learn at your own pace. This academic journey shouldn't just impart knowledge, it would empower you to use it.

2,7

3 reviews

5
0
4
1
3
1
2
0
1
1

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their exams and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can immediately select a different document that better matches what you need.

Pay how you prefer, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card or EFT and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions