100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

CDT 2024 EXAM QUESTIONS AND DETAILED ANSWERS| A+ GRADE

Rating
-
Sold
-
Pages
23
Grade
A+
Uploaded on
11-03-2024
Written in
2023/2024

CDT 2024 EXAM QUESTIONS AND DETAILED ANSWERS| A+ GRADE

Institution
Course










Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Course

Document information

Uploaded on
March 11, 2024
Number of pages
23
Written in
2023/2024
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

CDT 2024 EXAM QUESTIONS AND
DETAILED ANSWERS| A+ GRADE

1. The method of computation of Contractor's overhead and
profits for Change Order prices, where both additions and
deletions are involved, is found in the:
a) Agreement.
b) Conditions of the Contract.
c) Division 01.
d) Instructions to Bidders. Correct Answer b) Conditions of the
Contract.

2. General Requirements are part of:
a) Supplementary Conditions.
b) Bidding Requirements.
c) Specifications.
d) Summary of Work. Correct Answer c) Specifications.

3. The three essential considerations in the evaluation of a
product are:
a) Requirements, Criteria, and Tests.
b) Costs, Maintenance, and Installation.
c) Life Cycle Cost, Installation Cost, and Maintenance Cost.
d) Case studies, Failures, and Problems. Correct Answer a)
Requirements, Criteria, and Tests.

4. Whose responsibility is it to furnish the Shop Drawings?
a) The Architect/Engineer
b) The Contractor
c) The Owner
d) The Subcontractor Correct Answer b) The Contractor

5. The division of the Work among multiple prime Contracts is
described in:
a) Instructions to Bidders.

,b) Supplementary Conditions.
c) Division 01.
d) Special Conditions. Correct Answer c) Division 01.

6. During the Project Conception Stage, the A/E may be
retained to:
a) Develop outline specifications
b) Describe the character of the mechanical system
c) Prepare renderings
d) Assist in financial feasibility studies Correct Answer d) Assist
in financial feasibility studies

7. What is the main purpose of MasterFormat?
a) for scheduling, value management, recording of design data
and managing costs.
b) used during the planning stage of a project.
c) to organize the Project Manual, reference keynotes and
detailed cost estimates.
d) when there is a standardized need for information to appear
upon each page of a project manual. Correct Answer c) to
organize the Project Manual, reference keynotes and detailed
cost estimates.

8. The person who becomes secondarily liable for another's
debt or performance is called the:
a) Guarantee
b) Warrantor
c) Guarantor
d) Warrantee Correct Answer c) Guarantor

9. Integrated projects are distinguished by all of the following
characteristics except:
a) Development of virtual project model through input from a
collaborative team
b) Trust-based collaboration between project team members
c) Maximized efficiency through design, fabrication, and
construction

, d) "Just as needed" team involvement to reduce owner's pre-
construction expenses Correct Answer d) "Just as needed"
team involvement to reduce owner's pre-construction expenses

10. Outline Specifications are written for
a) only Divisions 02-14 where actual products are discussed
b) Divisions 01-49
c) only Divisions 01-14 (excluding mechanical and electrical)
d) the exclusive use of the A/E Correct Answer b) Divisions 01-
49

11. An example of a MasterFormat Level 3 specification
Section is:
a) 05 00 00 Metals.
b) 05 20 00 Metal Joists.
c) 05 21 00 Steel Joist Framing.
d) 05 21 19 Open Web Steel Joist Framing. Correct Answer d)
05 21 19 Open Web Steel Joist Framing.

12. What activities take place in the Project Conception Stage?
a) The engineers develop the mechanical and electrical
systems.
b) The site is selected and the demolition is done.
c) Feasibility studies and budget is set.
d) The program is evaluated and the engineers are selected.
Correct Answer c) Feasibility studies and budget is set.

13. The document recommended to organize preliminary
construction information into a standard order on the basis of
systems and assemblies is:
a) MasterFormat
b) Uniformat
c) Outline Specifications
d) Project Manual Correct Answer b) Uniformat

14. All design and construction drawings can be classified as
one of two types of views:

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Tutorkev Teachme2-tutor
Follow You need to be logged in order to follow users or courses
Sold
112
Member since
1 year
Number of followers
50
Documents
462
Last sold
1 month ago
TUTOR KEV

Your upcoming test doesn\'t have to keep you awake any longer. Find the highest of quality Exams,summaries and study guides with latest questions and detailed answers with rationales to assist you prepare for the oncoming tests.

4,5

36 reviews

5
28
4
5
3
0
2
0
1
3

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their exams and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can immediately select a different document that better matches what you need.

Pay how you prefer, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card or EFT and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions