GCSS Army PRACTICAL EXERCISE -CPE questions and answers
3.Which A (Aging) indicator displays in the recoverable/ reparable conversion by YOBUX TRANSATION IF THE RETURN (ZRL/ZRX) PR is 36 days old C. RED 4.What screen title displays in the initial screen of the migo transaction . A. The screen title depends on the last movement type that was posted. is the menu path used to enter time confirmation and complete a work order. A. Order>confirmation >overall completion confirmation number is associated with the status that is used to deadline the equipment. A. 30 7. When creating a dispatch (d1) notification , what cannot be done before the notification is saved and the notification number is generated C .the equipment dispatch 5987 form cannot be printed What is the number of the inbound delivery that is associated with a dedicated order from national What link should be clicked in the AIT application to perform a customer pick up at the Ssa and to bring materials into the units inventory Pgr What materials is available for this issue to work order From an existing p.m. notification which button is selected to create the preventative maintenance pmo2 to work order Button #2 In a maintenance notification where is the how recognize code selected In the coding field Which button do you click to display the listing of the classes of supply they can be requisition by the MRP area Ext. Matl group What button is used to trigger the install/Dismantle process for the selected engine Goods movement icon What is the number of the return Zxs - pr that was created What's up systems are currently install in the functional location structure A 50 caliber machine gun radio set What operational status symbol is used to indicate that equipment is non-mission capable due to maintenance requirement Nmc Maintience How is the condition code enter in a good receipt posting for FOi material The Equipment records parts specialist must click the check button and select a cc condition code What number is selected as the reason for movement when FYI materials are being added to the unit inventory 243 What number or alpha numeric code must be selected to install the 7.6 2 MMM240 machine gun into the FunXional location structure The functional location a QC alpha numeric code If you did not issue all of the materials require any work order which of the following will you not be able to perform Technically completing the work order How long has the notifications that deadline the equipment been open Notification to Has been open since What date was the material Received by the unit 11/03/2014 Which purchase requisition document type is used to turning a recoverable repairable material for Remote customers to the SSA ZRX
Written for
- Institution
- GCSS ARMY
- Course
- GCSS ARMY
Document information
- Uploaded on
- February 26, 2024
- Number of pages
- 4
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
-
gcss army practical exercise cpe
Document also available in package deal