Vivint Smart Home Pro Final Exam Questions & Answers Already Graded A +
12-24v - What is the input voltage range of the Doorbell Cam? 16.5 VAC - What is the output voltage of the transformer used to power the SkyControl panel? true - True or False: When programming a sensor into the sky panel you can type in the serial number or "learn" it in by triggering the device 2 - When programming a DW21, which loop number is used? 1 2 3 beans and wire caps - Which of the following materials can you use to group multiple ground terminals in a takeover module: Solder String Wire Caps Duct Tape Beans True - T or F: When installing the firefighter, it is required to test the customer's existing smoke detectors 3/4" - When installing a DW21, what size bit should you use to drill the hole for the sensor? 1/2" 3/8" 3/4"1" True - T or F: When installing the TAKE-345, you must ensure that the transformer is supplying power to the power supply before the battery. True - T or F: You are required to test signals from all secondary keypads and key fobs even though they are not detection devices False - T or F: When running power to the TAKE-345 polarity does not apply - What is the correct height at which to install the PIR2? 7 ft At least 5 ft At least 7 ft At 7.5 ft How would you program a CO3 if mounted on a hallway wall? Loop 1 Zone 8 Loop 1 Zone 14 Loop 3 Zone 4 Loop 1 Zone 4 - When installing a DW21 into a metal door frame, with a wooden door, what should you be sure to use? Metal Drill bit A DW11 should be used on all metal door frames 3/4" insulated magnet Eye goggles - True - T or F: Panic Pendants are programmed as an audible alarmT or F: The Firefighter may be installed next to a stand-alone battery-powered smoke detector - Which of the following zone/sensor types are correct when programming an SMKT3? Type 9 - Freeze Detect Type 7 - Freeze Detect Type 9 - Heat detect Type 6 - heat detect type 1 - heat detect type 8 - freeze detect type 5 - smoke detect type 7 - smoke detect type 9 - smoke detect - When installing a DW21 where is the approved location for the sensor? Anywhere in the door between 6"(15 cm) and 2' (61 cm) from floor Below 6" from the floor Top of the door - T or F: When performing a full system test, you may bypass any open doors or windows - T or F: When installing a translator, you must program all of the existing sensors as new equipment on the panel - When programming a DW11 that has been installing on a window, which zone/sensor type should you use? 10 0102 03 - T or F: When installing an SMKT3, you must use the included screws and anchors - True - T or F: when installing the TAKE-345 you must always test the new 12v Battery before using it T or F: The SMKT3 has only 2 functions: smoke and heat detection - When programming a PIR2, which loop number must you use? 3 2 1 10 4 - How would you program a GB2 when it is mounted on a master bedroom ceiling? Loop 3 Zone 3 Loop 3 Zone 1 Loop 1 Zone 1 Loop 1 Zone 3 - T or F: The DW21 sensor should always be installed in the door frame - true - T or F: When wiring a TAKE 345, you must ensure that has 3 points of ground; the low side of each zone, the takeover module, and the power supply
Written for
- Institution
- Vivint Smart Home Pro
- Course
- Vivint Smart Home Pro
Document information
- Uploaded on
- December 27, 2023
- Number of pages
- 8
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
-
vivint smart home
Document also available in package deal