100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

4th TSSA Part B Unit 4 Exam Questions and Answers.

Rating
-
Sold
-
Pages
7
Grade
A+
Uploaded on
21-12-2023
Written in
2023/2024

4th TSSA Part B Unit 4 Exam Questions and Answers.

Institution
Course









Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Course

Document information

Uploaded on
December 21, 2023
Number of pages
7
Written in
2023/2024
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

4th TSSA Part B Unit 4
Exam Questions and
Answers
Larger capacity, high pressure fuel trains are - Answer-more complex

The main burner test firing valve should be opened - Answer-before starting the main
burner

What is the recommended boiler water pH for wet layup? - Answer-10

R4B04-03-03-07 Failure to _____ the furnace thoroughly before light-up can cause a
furnace explosion. - Answer-purge

R4B04-05-02-01 When cooling down a steam boiler that has been taken out of service,
a vent valve on a steam drum should be opened to: - Answer-Prevent a vacuum from
forming in the boiler

How often should operator rounds be performed? - Answer-1 to 3 times per shift

What should Power Engineers carry at all times? - Answer-a flashlight

When a power failure occurs, control valves - Answer-go to a fail-safe position.

When a combustion air opening is equipped with dampers, the dampers must be -
Answer-interlocked with the burner, and fully open before starting the boiler.

New boilers require a _____________ and a _____________ dry-out before entering
operation. - Answer-boil-out, refractory

R4B04-03-03-11 If a steam boiler is in service and no water level shows in the gauge
glass, the first action would be to: - Answer-determine whether the gauge glass is
completely full or completely empty.

Because natural gas is colourless and odourless, ___________ is added to the gas so
that it is easier to detect a leak. - Answer-mercaptan

, In a multiple boiler high pressure steam plant, when starting an entire system from cold
- Answer-The entire system warms and pressurizes as one boiler warms, except for the
boilers being left off line.

On a semi-automatic ignition system, the switch on the supervised cock - Answer-keeps
the boiler from pre-purging if the main test firing valve is open.

Which code contains information on safety valves for high pressure steam boilers? -
Answer-ASME Section I

R4B04-01-02-04 New refractory in a boiler must be thoroughly dried on low fire -
Answer-to dry the refractory slowly and keep it from cracking.

What is the recommended test frequency for flame safeguard devices? - Answer-weekly

If the safety relief valve of a hot water heating boiler is set to open at 207 kPa, the
operating pressure should not exceed - Answer-138 kPa.

R4B04-03-03-06 Furnace explosions may be caused by: - Answer-The accumulation of
fuel-air mixture in the furnace

When preparing to start a steam boiler with a fully modulating firing rate control, set the
manual/automatic switch to _________ and the flame control switch to the __________
position. - Answer-manual, low-fire

Who should verify a steam boiler lockout? - Answer-A second qualified operator.

When closing up a boiler, - Answer-new handhole and manhole gaskets must be used,
to prevent dangerous blowouts and costly unplanned boiler outages.

R4B04-03-02-01 A wide and rapid fluctuation of the water level in a boiler gauge glass
may be the result of: - Answer-High dissolved solids concentration in the boiler water

Which of the following is NOT done when preparing a steam boiler feedwater system? -
Answer-Open the feedwater control bypass valve.

In the event of a power failure, which of the following will likely require a manual restart
when power is restored? - Answer-large air compressors

R4B04-03-03-02 If the water level in the boiler gauge glass cannot be seen, the first
thing to do is: - Answer-Open the gauge glass drain to determine whether the glass is
full or empty.

When warming up a steam boiler, open the boiler drum vent to - Answer-permit the
release of corrosive dissolved gases, such as oxygen and carbon dioxide, from the
boiler water.
R170,78
Get access to the full document:

100% satisfaction guarantee
Immediately available after payment
Both online and in PDF
No strings attached

Get to know the seller
Seller avatar
WisdomLogic

Get to know the seller

Seller avatar
WisdomLogic Teachme2-tutor
Follow You need to be logged in order to follow users or courses
Sold
6
Member since
2 year
Number of followers
4
Documents
54
Last sold
2 year ago
Smartstudy ,elevate your academic game

Assignments, Case Studies, Research, Essay writing service, Questions and Answers, Discussions etc. for students who want to see results twice as fast. I have can do papers on various topics and complexities with puntuality. I write engaging and informative content on all subjects. I have got good sense of structure and strive for my content to be of the highest quality. For every student you refer to me with an order that is completed and paid transparently, bonus assingments will be on the table

Read more Read less
0,0

0 reviews

5
0
4
0
3
0
2
0
1
0

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their exams and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can immediately select a different document that better matches what you need.

Pay how you prefer, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card or EFT and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions