Construction management exam 1 review questions (Ch. 1-7) already passed
Construction management exam 1 review questions (Ch. 1-7) already passed What are some concerns of Resident Project Representative or an inspector with respect to his or her project during the construction phase? Main focus: get what was paid for -> construction is done according to drawings/plans/specs/all contract docs What type of organizational structure is best suited for fast-track construction? Design-Build Under a construction management (CM) contract, should the CM firm's responsibilities normally begin at the construction phase, the design phase, the planning phase, or the conceptual phase? Conceptual phase A design-build firm may be (check all that apply): (a) a single firm with both design and construction capability; (b) a joint venture contract between a contractor and a design firm; (c) a design firm that sub-contracts the construction portion to a construction contractor; or (d) a construction contracting firm that subcontractors the design work to an architect or engineer firm. All of the above True or false? Under the Partnering concept, all differences are intended to be resolved at the lowest management level--preferably at the project site. True What types of relationships are intended to be established under a Partnering agreement? Trusting, responsive What are the five steps necessary to set up a Partnering workshop? 1. Creation of a Partnering charter 2. Development of an issue-resolution process 3. Development of a joint evaluation process 4. Discussion of individual roles and concerns 5. Presentation of a facilitated workshop Is Partnering a totally informal process, or should it be addressed in the specifications? Partnering is formal and should be written in specs. True or false? Under the CQC process, inspection is provided by the contractor. True What is the five-step process of initiating a project? 1. Advertise 2. Bid opening 3. Award contract 4. Sign contract 5. Notice to proceed Explain the one-to-one concept People on equal levels from different organizations communicate with each other. What is the principal barrier to the use of design-build contracts on public works projects? Laws (such as Brooks Law, Wicks Law, etc.) What is apparent authority? Assumed or implied authority. Opposite of expressed in writing Give an example of delegated authority Resident project engineer gets shop drawings from contractor What are the dangers of allowing the inspector to supervise the work? Responsibility shifts to resident project representative when it should be the responsibility of contractor When should materials be checked by the inspector? Upon arrival at the job site How much authority should be allowed to the Resident Project Representative or inspector--should he or she be permitted to approve Change Orders affecting time or cost? Inspector can't approve change orders Is it permissible for the owner's representative to issue instructions or orders to a subcontractor as long as they are directed to a management representative of that subcontractor? Inspector only talks to contractor, not subcontractor Who should have the sole authority to stop the work? Only person that can stop work is the owner Which of the following is an acceptable practice by the Resident Project Representative or the inspector? (a) To control the work (b) To supervise the work (c) To have the right to stop the work (d) None of the above practices is acceptable d True or false? If requested by the contractor, the Resident Project Representative or inspector may offer suggestions as to how to do the work. False True or false? If an inspector discovers that the work of a subcontractor is deficient, he or she should direct the subcontractor to make the necessary corrections, then tell the General Contractor what was done. False; The inspector should tell the general contractor to tell the subcontractor What are the three types of authority exercised in a construction contract? Apparent, expressed (written), limited It is a well-known principle that the engineer should not tell the contractor how to do the work; but, if the engineer observes that the contractor's construction methods appear to be unable to meet the specifications, what should the engineer do? Document it; send formal correspondence to someone and write in daily report Evaluation of the contractor's schedule submittal should be limited to what three principal concerns? Major milestones, when is notice to proceed date, and notice of substantial completion Why is it desirable to prepare an inspection plan prior to construction? So you know what date to schedule inspections for What basic equipment (not furnishings) should be required
Written for
- Institution
- Construction management
- Course
- Construction management
Document information
- Uploaded on
- October 2, 2023
- Number of pages
- 16
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
-
construction management exam 1 review questions c
Document also available in package deal