100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

BC Owner Builder Exam | 186 Questions and Answers(A+ Solution guide)

Rating
4,0
(2)
Sold
4
Pages
16
Grade
A+
Uploaded on
23-09-2023
Written in
2023/2024

Order of inspections - 1: forms, basement and crawlspace 2: Plumbing, dampproofing, foundation drainage , sanitary sewer, storm sewer, sump, water service 3: plumbing, electrical, mechanical, gas 4: framing inspection 5: insulation and vapour barrier 6: rainscreen/exterior finishs, drywall 7: building envelop inspection 8: final inspection Which is not an acceptable method for determining the correct grading for a trench? - An experienced excavator says it's ok At what depth is shoring required? - 1.2m/4ft Which best describes the principle of rain waterterm-0 deflection? - Design and construction that prevents water from ever entering What lighting safety certifications are required in Canada? - CSA safety certification What grit of sandpaper would get the smoothest result? - Higher grit with get a smoother finish What is the maximum rise in a flight of stairs? - The vertical height of any flight of stairs should not exceed 3.7m What is the minimum distance that a ladder must extend above a parapet wall or landing? - 3ft What heights are end dams to be on windows and door flashings? - 25mm/1 inchEnd dam use - Stop water from coming in When should you call for inspectors to make them efficient as possible? - Group inspectors together when possible and call when work is complete When is an HRV required? - Almost always What can you build under the owner-builder HPO process? - Single detached home under a single title. Single dwelling attached to pre-existing building older than 10 years. Single dwelling attached to a new non-residential building. Who issues permits for a gas fireplace? - Safety Authority (call Technical Safe BC) Can an owner builder take out their own electrical permit? - Yes, up to 200A What is the best way to apply asphalt waterproofing on a foundation? - Spray-on or roll on dry foundation with 2in. below grade When is the appropriate time to backfill a foundation? - After damp-proofing

Show more Read less
Institution
BC Owner Builder
Course
BC Owner Builder










Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
BC Owner Builder
Course
BC Owner Builder

Document information

Uploaded on
September 23, 2023
Number of pages
16
Written in
2023/2024
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

BC Owner Builder Exam Order of inspections - ✔✔ 1: forms, basement and crawlspace 2: Plumbing, dampproofing, foundation drainage , sanitary sewer, storm sewer, sump, water service 3: plumbing, electrical, mechanical, gas 4: framing inspection 5: insulation and vapour barrier 6: rainscreen/exterior finishs, drywall 7: building envelop in spection 8: final inspection Which is not an acceptable method for determining the correct grading for a trench? - ✔✔ An experienced excavator says it's ok At what depth is shoring required? - ✔✔ 1.2m/4ft Which best describes the principle of rain waterte rm-0 deflection? - ✔✔ Design and construction that prevents water from ever entering What lighting safety certifications are required in Canada? - ✔✔ CSA safety certification What grit of sandpaper would get the smoothest result? - ✔✔ Higher grit with get a smoother finish What is the maximum rise in a flight of stairs? - ✔✔ The vertical height of any flight of stairs should not exceed 3.7m What is the minimum distance that a ladder must extend above a parapet wall or landing? - ✔✔ 3ft What heights are end dams to be on windows and door flashings? - ✔✔ 25mm/1 inch End dam use - ✔✔ Stop water from coming in When should you call for inspectors to make them efficient as possible? - ✔✔ Group inspectors together when possible and call when work is complete When is an HRV required? - ✔✔ Almost always What can you build under the owner -builder HPO process? - ✔✔ Single detached home under a single title. Single dwelling attached to pre -existing building older than 10 years. Single dwelling attached to a new non -residential building. Who issues permits for a gas fireplace? - ✔✔ Safety Authority (call Technical Safe BC) Can an owner builder take out their own electrical permit? - ✔✔ Yes, up to 200A What is the best way to apply asphalt waterproofing on a foundatio n? - ✔✔ Spray -on or roll on dry foundation with 2in. below grade When is the appropriate time to backfill a foundation? - ✔✔ After damp -proofing What do you need to do when applying a peel and stick waterproof membrane foundation? - ✔✔ Use an approved prime r before installing What are gas meter installation requirements? - ✔✔ The distance from the gas vent to the roof must be greater than the overhang of the roof, nothing can be with in 1m either side or 4.5m above a gas meter When do you need to install a handrail or have fall protection? - ✔✔ 10ft, 4ft if no fall protection How high does a construction fence around a site need to be? - ✔✔ 6ft When installing the footer, it was dug down 2in. deeper than what the elevation should be. What needs to happen? - ✔✔ Install the footing form at proper elevation and fill with extra concrete When installing flashing for a roof valley how much do the asphalt shingles need to overlap? - ✔✔ 6in. What would cause a blister on a flat roof? - ✔✔ Moisture trapped under roof Water is backing up in a skylight, what do you do to fix it? - ✔✔ Clear drainage What needs to be done first when starting to install asphalt shingles on a roof? - ✔✔ Install eve protection What kind of fastener can you use in a wood that has been treated with chromated copper arsenate? - ✔✔ Lumber manufacturer approved fastener When should there be insulation under a basement slab? - ✔✔ When there is in floor heating How deep should the control joint be in a concrete slab? - ✔✔ 1/4 of the slab What kind of insulation should be installed under slab? - ✔✔ XPS What kind of insulation has the least moisture permeability? - ✔✔ XPS When framing a header of a staircase where does the framer get the nailing pattern? - ✔✔ Use the BC code section 9 nailing pattern What document must the owner submit to WorkSafe BC prior to starting construction? - ✔✔ Notice of project
R146,51
Get access to the full document:

100% satisfaction guarantee
Immediately available after payment
Both online and in PDF
No strings attached


Document also available in package deal

Reviews from verified buyers

Showing all 2 reviews
5 months ago

9 months ago

4,0

2 reviews

5
0
4
2
3
0
2
0
1
0
Trustworthy reviews on Stuvia

All reviews are made by real Stuvia users after verified purchases.

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
PatrickKaylian Delaware State University
Follow You need to be logged in order to follow users or courses
Sold
1818
Member since
2 year
Number of followers
1043
Documents
22126
Last sold
1 day ago

3,8

316 reviews

5
147
4
60
3
54
2
15
1
40

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their exams and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can immediately select a different document that better matches what you need.

Pay how you prefer, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card or EFT and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions