CYB-210 7-2 Project One Network Diagram and Rationale.
CYB-210 7-2 Project One Network Diagram and Rationale. Network Design Rationale 1. New Ip Configuration to combine existing subnets Subnet1 and Subnet2 were merged to form Network A. The secondary router from Subnet two was required, and a new configuration was built using 192.168.1.1 as the gateway. All clients were assigned a static IP within the given scope. Additionally, the now unused port FA 1/0 was closed on the Subnet_Router per security best practice. To confirm communication functionality within the subnet, several packets were transmitted across various machines.
Written for
- Institution
- Southern New Hampshire University
- Course
- CYB-210 (CYB210)
Document information
- Uploaded on
- April 13, 2023
- Number of pages
- 7
- Written in
- 2022/2023
- Type
- Essay
- Professor(s)
- Unknown
- Grade
- A+
Subjects
-
cyb 210 7 2 project one
-
cyb 210 project one
-
cyb 210 7 2 project one network diagram and rationale
-
cyb 210 7 2 network diagram and rationale
-
cyb 210 project one network diagram and rationale
Document also available in package deal