NERC Transmission Practice Test, Exam Q&As, A+ Guide-Station #1 is at 539KV and station #2 is at 534 KV. Which direction will the MVAR typically flow? A. From station #1 to station #2 B. From station #2 to station #1 C. Downhill based on power angle D. Uphill based on power angle - A. From station #1 to station #2 Each transmission operator shall arrange for supply of _____ resources within its boundaries to protect the voltage levels under contingency conditions A. Transmission B. Generation C. Reactive D. Regulating - C. Reactive Relay schemes should be designed so that automatic re-closing during _____ conditions should be prevented A. System restoration B. TLR C. Out of step D. Thunderstorm - C. Out of step You received indication that all of the CBs on a bus have opened and locked out, which of the following relays would you have expected to operate? A. 59G B. 87B C. 87T D. 21-1 - B. 87B High speed relays, high-speed circuit breakers, and ____ should be used where studies indicate the application will enhance stability margins A. Automatic voltage regulators B. Automatic re-closings C. Special protection schemes D. Under frequency relaying - B. Automatic re-closings Dynamic thermal ratings are ratings that limit transmission line loading A. With a conservative mindset B. With current temperature and wind speed C. Based on current transaction schedules D. Based on projected transaction schedules - B. With current temperature and wind speed In order for each transmission operator to protect its system voltage levels under normal and contingency conditions, they must acquire which of the following? A. Sufficient reactive resources B. Dynamic reactive resources C. Sufficient generation supplies D. Sufficient transmission capacity - A. Sufficient reactive resources Which of the following would be a concern if you were operating on the system with an open ended transmission line? A. Ferranti-rise effect B. Transmission Loop flows C. Exceeding surge impedance loading D. Reactive depletion - A. Ferranti rise effect Which of the following devices would you use if you were calculating dynamic reactive reserve for your systems A. Shunt reactors B. Transformers C. Shunt capacitors D. Generators - D. Generators Which of the following is an advantage of coordinating planned transmission outages? A. Ensure system reliability B. Increasing transmission overloads C. Keeping information away from generators D. Not having to post on OASIS - A. Ensur

Show more Read less
Institution
NERC Transmissio
Course
NERC Transmissio










Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
NERC Transmissio
Course
NERC Transmissio

Document information

Uploaded on
February 24, 2023
File latest updated on
January 14, 2025
Number of pages
18
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

NERC Transmission Practice Test, Exam
Q&As, A+ Guide
Station #1 is at 539KV and station #2 is at 534 KV. Which direction will the
MVAR typically flow?
A. From station #1 to station #2
B. From station #2 to station #1
C. Downhill based on power angle
D. Uphill based on power angle - A. From station #1 to station #2

Each transmission operator shall arrange for supply of _____ resources within its
boundaries to protect the voltage levels under contingency conditions
A. Transmission
B. Generation
C. Reactive
D. Regulating - C. Reactive

Relay schemes should be designed so that automatic re-closing during _____
conditions should be prevented
A. System restoration
B. TLR
C. Out of step
D. Thunderstorm - C. Out of step

You received indication that all of the CBs on a bus have opened and locked out,
which of the following relays would you have expected to operate?
A. 59G
B. 87B
C. 87T
D. 21-1 - B. 87B

High speed relays, high-speed circuit breakers, and ____ should be used where
studies indicate the application will enhance stability margins
A. Automatic voltage regulators
B. Automatic re-closings

,C. Special protection schemes
D. Under frequency relaying - B. Automatic re-closings

Dynamic thermal ratings are ratings that limit transmission line loading
A. With a conservative mindset
B. With current temperature and wind speed
C. Based on current transaction schedules
D. Based on projected transaction schedules - B. With current temperature and
wind speed

In order for each transmission operator to protect its system voltage levels under
normal and contingency conditions, they must acquire which of the following?
A. Sufficient reactive resources
B. Dynamic reactive resources
C. Sufficient generation supplies
D. Sufficient transmission capacity - A. Sufficient reactive resources

Which of the following would be a concern if you were operating on the system
with an open ended transmission line?
A. Ferranti-rise effect
B. Transmission Loop flows
C. Exceeding surge impedance loading
D. Reactive depletion - A. Ferranti rise effect

Which of the following devices would you use if you were calculating dynamic
reactive reserve for your systems
A. Shunt reactors
B. Transformers
C. Shunt capacitors
D. Generators - D. Generators

Which of the following is an advantage of coordinating planned transmission
outages?
A. Ensure system reliability
B. Increasing transmission overloads
C. Keeping information away from generators

, D. Not having to post on OASIS - A. Ensure system reliability

If your system experiences an operating security limit violation, as an operator,
you are supposed to return your transmission system to within its limits as soon as
possible, but no longer than how many minutes?
A. 10 minutes
B. 20 minutes
C. 30 minutes
D. 60 minutes - C. 30 minutes

Which of the following system elements would be considered reactive power
sources?
1. Generators
2. Shunt reactors
3. Transformers
4. Synchronous condensers

A. 1 & 3
B. 2 & 3
C. 3 & 4
D. 1 & 4 - D. 1 & 4

If a transmission line is open ended, where is the highest voltage experienced on
the line?
A. On the closed end of the line
B. On the open end of the line
C. The voltage is the same on both ends of the line
D. There is no voltage since it is open on one end - B. On the open end of the line

If a transmission operator is requested to operate a transmission line to its short
time rating, this means that the facility can be operated above which of the
following?
A. Normal continuous rating
B. Emergency rating
C. 150% of the line rating
D. 175% of the MVA limit - A. Normal continuous rating
R225,36
Get access to the full document:

100% satisfaction guarantee
Immediately available after payment
Both online and in PDF
No strings attached


Document also available in package deal

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
ProfMiaKennedy Arizona State University
Follow You need to be logged in order to follow users or courses
Sold
1986
Member since
4 year
Number of followers
1609
Documents
3280
Last sold
5 days ago

We all get stuck sometimes, you feel frustrated about exams coming up and not fully prepared? Worry no more mate, with my documents i assure you atleast an A, get unstuck with the most recent, analyzed and graded exams with just a simple mouse click... Download and crash those exams!!

3,9

378 reviews

5
195
4
57
3
55
2
25
1
46

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their exams and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can immediately select a different document that better matches what you need.

Pay how you prefer, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card or EFT and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions