• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 4 out of 87 pages
Summary

Summary Geo358 A2 reading summaries

Document preview thumbnail
Preview 4 out of 87 pages

Geo358 A2 reading summaries

Content preview

GEO 358 • Weeks 7–12 • Reading Summaries




GEO 358 • WEEKS 7–12


All Reading Summaries
Every reading from weeks 7 to 12, each with a synopsis, key takeaways, details, visuals and a condensed version,
plus a linking section per week



WEEK SA water resources, inter-basin transfers & flow gauging
7
WEEK Forests, water & streamflow; impact of changing land use
8
WEEK Water quality: acid mine drainage & nutrient pollution
9
WEEK Water treatment & phytoremediation
10
WEEK Water law, IWRM & wetlands
11
WEEK Water governance & extreme events (drought and flood)
12


How to use this document
● Each week starts on a new page with its own cover, and the page header shows which week you’re in.
● Within each week, every reading has its own colour and ends with a section on how the readings link
together.




1

, GEO 358 • Week 7 • Reading Summaries




GEO 358 • WEEK 7

Water Resources, Transfers
& Monitoring
Reading Summaries
SA’s scarce, uneven water • The Lesotho Highlands Water Project • Flow-gauging structures



1 De Villiers, Schmitz & Booysen SA’s water resources and the Lesotho Highlands Water
(1996) Scheme

2 Waites (2000) The Lesotho Highlands Water Project


3 Wessels & Rooseboom (2009) Flow-gauging structures in SA rivers, Part 1: An
overview




How to use this document
● Each reading has its own colour. Every summary runs Synopsis → Key takeaways → Important details
→ Visuals → Condensed version.
● The two LHWP readings were written at different planning stages (1996 vs 2000), so some dam
heights and tunnel lengths disagree. A comparison table in the linking section shows which figure to
use.
● The final section, How the readings link together, is built for synthesis questions.




2

, GEO 358 • Week 7 • Reading Summaries




READING 1

South Africa’s water resources and the Lesotho Highlands
Water Scheme: a partial solution to the country’s water
problems
De Villiers, G. du T., Schmitz, P.M.U. & Booysen, H.J. (1996). Water Resources Development 12(1), 65–77




Synopsis
Written just after 1994, this paper sets out why South Africa is water-stressed: low and highly variable rainfall,
very high evaporation, runoff concentrated far from where people and industry are, and limited groundwater. It
then analyses demand by sector, with irrigation the biggest user, followed by domestic, industrial, mining,
power and forestry, plus projections to 2010. It argues that scarce water needs imaginative management and
trade-offs. The Lesotho Highlands Water Scheme is presented as a partial solution: a phased, multi-dam transfer
that would double Gauteng’s water supply, earn Lesotho royalties and hydropower, and improve water quality
in the Vaal by blending.

Key takeaways
● Mean annual rainfall is just under 500 mm, against a world average of 860 mm. It falls from 1250 mm
on the east/south coast to <50 mm on the west coast, and variability rises as rainfall falls.
● Only ~9% of rainfall becomes runoff (~54 000 million m³/yr). 75% of runoff comes from 32% of the
land (east coast); the interior (64% of land) gives only 15%.
● Only ~60% of runoff can be used, and groundwater supplies <10% of consumption. Gauteng holds
~25% of the population on <5% of the land, so water must be imported.
● Irrigation uses just over 50% of water (1990). Domestic and industrial demand is growing fastest.
Mining, power and forestry are strategic users.
● The LHWS was designed for phased development: start high (Katse) and add lower dams as demand
grows. It totals ~70 m³/s, enough to meet Gauteng’s needs to ~2021.
● Royalties for Lesotho are based on the cost saving compared with SA’s cheapest in-country
alternative: ~12 c/m³, shared, or ~R130 million/yr for Lesotho.



Important details & specific points
Supply side
● Area 1 129 782 km²: a large plateau, an escarpment and a narrow coastal plain. ~80% of rain falls October–
March (summer rainfall); droughts are regular.
● Rainfall: 50% of the land gets <400 mm, 30% gets 400–800 mm, and only 20% gets >800 mm.

● Evaporation ranges from ~1200 mm (east) to ~2750 mm (west), causing big losses at the ~200 major
reservoirs.
● Runoff as % of rainfall: <5% in dry areas, >80% where rain >2000 mm, >50% in urban areas (hard surfaces).

● Existing large reservoirs can store 44% of mean annual runoff.

● Groundwater: mostly in secondary aquifers. The primary aquifers are west-coast sand and PWV dolomite.
Potential is ~5000 million m³/yr (~15% of runoff), limited by distribution and subsidence in mining areas.
● Unconventional sources: desalination (US$2–4/m³ plus delivery), rain stimulation (needs research), and
sewage effluent reclamation (the only one economically competitive).


3

, GEO 358 • Week 7 • Reading Summaries


● Vaal dams yield 1545 million m³/yr, which was enough until the 1970s. Since 1974 the Tugela–Vaal scheme
has lifted water 506 m over the escarpment, adding 370 million m³/yr.




Demand side
Sector 1990 (million m³/yr, %) 2010 projected (million m³/yr,
%)

Irrigation 9695 (50.9%) 11 885 (45.9%)

Municipal & domestic 2281 (12.0%) 4477 (17.3%)

Industrial 1448 (7.6%) 2961 (11.4%)

Mining 511 (2.7%) 649 (2.5%)

Power generation 444 (2.3%) 900 (3.5%)

Stock watering / nature conservation

Forestry runoff reduction (indirect) 1427 (7.5%) 1700 (6.6%)

Ecological: estuaries & lakes 2767 (14.5%) 2767 (10.7%)

Total 19 043 25 888


● Irrigation: ~1.0 million ha irrigated out of 1.4 million ha potential (19% government schemes, 22% irrigation
boards, 59% private). Accurate use statistics are lacking. Efficiency gains free up a lot of water.
● Population: ~48 m (2000) rising to ~60 m (2010), growing ~2%/yr. The RDP raises domestic demand, and
Gauteng shows the biggest growth.
● Mining: >15% of GNP, >700 000 jobs, ~85% of revenue from exports. Mines have cut water use ~30%
through recycling. ~50% of mining demand will be in Gauteng by 2000.
● Power: Eskom supplied ~90% of SA’s electricity (~60% of Africa’s), >45 000 MW. Coal stations sit where
water is short, so dry cooling (~30% water saving). Hydro is only viable alongside water-supply works.
● Forestry: ~1.1 million ha of plantations; a permit system since 1972. Catchments 58–100% afforested lose
65–90% of MAR, but forestry also reduces flood peaks, erosion and sediment.
● Environment: estuaries and lakes need ~2790 million m³/yr; ~300 conservation areas (3.6 m ha) need 177
million m³/yr.
● Water is described as an “ephemeral migrant commodity”: its value ranges from destructive (floods) to
precious, and it can serve several users at once.



4

Document information

Uploaded on
November 1, 2026
Number of pages
87
Written in
2026/2027
Type
Summary
R100,00

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Sold
0
Followers
0
Items
4
Last sold
-



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their exams and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can immediately select a different document that better matches what you need.

Pay how you prefer, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card or EFT and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions