100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Summary

Operations management summary H7 Projects

Rating
-
Sold
-
Pages
3
Uploaded on
13-09-2021
Written in
2020/2021

This summary deals mainly with projects. How to cut it in short, reduce costs, and which one you can choose best.

Institution
Course








Whoops! We can’t load your doc right now. Try again or contact support.

Connected book

Written for

Institution
Study
Course

Document information

Summarized whole book?
No
Which chapters are summarized?
H7
Uploaded on
September 13, 2021
Number of pages
3
Written in
2020/2021
Type
Summary

Subjects

Content preview

Operations management H7
Project = interrelated set of activities with a definite starting and ending point, which
results in a unique outcome for a specific allocation of resources (set van
activiteiten met een begin en een eind)
Project management = a systemized, phased approach to defining organizing,
monitoring, and controlling projects
Defining and organizing projects:
1. Defining the Scope and Objectives of a project
2. Selecting the Project manager and Team
- Facilitator
- Communicator
- Decision maker
- Technological competence
- Sensitivity dedication
3. Recognizing organizational structure
- Functional
- Pure project
- Matrix
Constructing Project Networks:
- Defining the work breakdown structure
- Diagramming the network
- Developing the project schedule
- Analyzing cost time trade-offs
- Assessing and analyzing risks
Defining the Work Breakdown Structure:
- WBS = a statement of all work that has to be completed
- Activity = smallest unit of work effort consuming both time and resources
that the project manager can schedule and control

Diagramming the Network:
= a visual display designed to depict the relationship between activities, that consist
of hodes (circles) and arcs (arrows)
- PERT = program evaluation and review technique
- CPM = critical path method
- Precedence relationship = a relationship that determines a sequence for
undertaking activities
o Specifies a activity die kan niet eerder beginnen als de ander is
afgerond
- Estimating activity times
o Statistical methods
o Learning curve models
o Managerial opinions
R80,90
Get access to the full document:

100% satisfaction guarantee
Immediately available after payment
Both online and in PDF
No strings attached

Get to know the seller
Seller avatar
lieker

Document also available in package deal

Get to know the seller

Seller avatar
lieker Universiteit Twente
Follow You need to be logged in order to follow users or courses
Sold
6
Member since
4 year
Number of followers
5
Documents
32
Last sold
1 year ago
Alles voor Technische Bedrijfskunde op het Windesheim

Ik verkoop allemaal samenvattingen die ik door mijn jaar heen maak voor al mijn vakken. Koop ze als je het leuk en handig vind. Ik zet niet alles online maar als je materiaal wilt hebben stuur gerust een berichtje :)

0,0

0 reviews

5
0
4
0
3
0
2
0
1
0

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their exams and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can immediately select a different document that better matches what you need.

Pay how you prefer, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card or EFT and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions