, GGH3705
OCTOBER / NOVEMBER (PORTFOLIO)
2026
DUE 30 OCTOBER 2026
ENVIRONMENTAL IMPACT REPORT (EIR) – PROPOSED REGIONAL SHOPPING MALL,
JOHANNESBURG
Prepared in accordance with the National Environmental Management Act 107 of 1998 (NEMA)
and the EIA Regulations, 2014 (as amended)
1. GEOGRAPHICAL DESCRIPTION
1.1 Site A: Preferred Site – Midrand (Region A)
Geographical description of Midrand, City of Johannesburg (1)
Midrand is situated in the northern portion of the City of Johannesburg Metropolitan Municipality,
approximately midway between Johannesburg and Pretoria. The area lies at an elevation of roughly
1,500–1,600 metres above sea level on the quartzite ridges and granite-gneiss terrain characteristic
of the Witwatersrand Basin margin (Hansen and Robb, 2017:11). The climate is subtropical
highland, with warm summers and cool, dry winters; mean monthly temperatures range from
approximately 10.3°C in July to 19.8°C in February, while annual precipitation averages around 713
mm, concentrated in the October–March summer rainfall season (Hansen and Robb, 2017:11).
Midrand has undergone rapid commercial and residential densification over the past two decades
and functions as a key economic corridor between the Gauteng metros.
Exact location of Site A (3)
,Evaluation of site characteristics (6)
Topography: The site is predominantly flat, with a gentle slope (less than 3%) from northwest to
southeast. No significant rock outcrops or steep gradients are present.
Flora: The site falls within the Egoli Granite Grassland vegetation type, which is endemic to
Gauteng and regarded as the most sensitive vegetation type to urbanisation in the City of
Johannesburg (Hansen and Robb, 2017:36). However, the site has been previously disturbed by
informal grazing and historical clearing; remaining vegetation consists largely of pioneer grass
species (Hyparrhenia hirta, Eragrostis curvula) with scattered exotic invader plants. No Red Data
plant species were observed during the preliminary walkover, though a follow-up floristic
survey is recommended.
Fauna: The site offers limited habitat value. Small mammals (rodents), common reptile species,
and urban-adapted birds are likely present. No sensitive or protected faunal species were
recorded.
Hydrology: A non-perennial drainage line traverses the eastern boundary of the site. This
watercourse is tributary to the Jukskei River system. A 32-metre buffer is legally required under
the EIA Regulations (Hansen and Robb, 2017:36).
Geology and soils: The site is underlain by Witwatersrand quartzite and shale, with residual
granite-derived soils in places. The soils are moderately deep and well-drained.
1.2 Site B: Alternative Site – Soweto (Region D)
Geographical description of Soweto, City of Johannesburg (1)
Soweto is located approximately 20 km southwest of the Johannesburg central business district,
situated on the undulating Highveld plateau at an elevation of approximately 1,600–1,700 metres.
The area experiences the same subtropical highland climate as Midrand, with slightly greater
temperature extremes and similar summer rainfall patterns (Hansen and Robb, 2017:11). Soweto is
South Africa's largest historically Black urban complex and has experienced significant retail and
infrastructure investment in recent years, although unemployment and service-delivery backlogs
remain challenges in parts of the area.
Exact location of Site B (3)
, Evaluation of site characteristics (6)
Topography: The site is gently undulating, with slopes of 2–5% and a slight depression in the
central portion where surface water collects during summer rains.
Flora: The site is dominated by disturbed grassland with Cynodon dactylon and Hyparrhenia
hirta. A small patch of what appears to be remnant Egoli Granite Grassland occurs along the
southern boundary. This vegetation type is a conservation priority in the City of Johannesburg
(Hansen and Robb, 2017:36).
Fauna: Similar to Site A, the faunal diversity is low. However, the adjacent undeveloped corridor
to the south may serve as a movement path for small mammals and reptiles.
Hydrology: A tributary of the Klip River runs approximately 200 m east of the site. No
watercourse traverses the site itself, reducing the regulatory complexity associated with
water-use licensing.
Geology and soils: The site is underlain by quartzite of the Witwatersrand Supergroup, with
shallow, rocky soils in places. Excavation costs may be higher than at Site A.
1.3 Comparison of Sites and the No-Go Alternative (2)
Criterion Site A (Midrand) Site B (Soweto)
Excellent – direct access to N1 and arterial Moderate – reliant on R558 and local
Accessibility
roads roads
Environmental Moderate – drainage line present, Moderate–high – remnant Egoli Granite
sensitivity disturbed grassland Grassland
Bulk services capacity High – existing commercial infrastructure Limited – requires service upgrades
Socio-economic need Lower – already well-served retail Higher – addresses retail undersupply
Construction
Lower – flat terrain, less rock Higher – shallow rock, localised wetland
complexity
The no-go alternative would result in no development on either site. While this would preserve the
existing (largely disturbed) vegetation and avoid construction-phase impacts, it would forgo the
economic and social benefits of a regional retail facility, including an estimated 1,200 construction
jobs and 800 permanent jobs. Given the City of Johannesburg's Spatial Development Framework
2040 emphasis on densification and economic node development, the no-go alternative is not
considered desirable (Hansen and Robb, 2017:24).
OCTOBER / NOVEMBER (PORTFOLIO)
2026
DUE 30 OCTOBER 2026
ENVIRONMENTAL IMPACT REPORT (EIR) – PROPOSED REGIONAL SHOPPING MALL,
JOHANNESBURG
Prepared in accordance with the National Environmental Management Act 107 of 1998 (NEMA)
and the EIA Regulations, 2014 (as amended)
1. GEOGRAPHICAL DESCRIPTION
1.1 Site A: Preferred Site – Midrand (Region A)
Geographical description of Midrand, City of Johannesburg (1)
Midrand is situated in the northern portion of the City of Johannesburg Metropolitan Municipality,
approximately midway between Johannesburg and Pretoria. The area lies at an elevation of roughly
1,500–1,600 metres above sea level on the quartzite ridges and granite-gneiss terrain characteristic
of the Witwatersrand Basin margin (Hansen and Robb, 2017:11). The climate is subtropical
highland, with warm summers and cool, dry winters; mean monthly temperatures range from
approximately 10.3°C in July to 19.8°C in February, while annual precipitation averages around 713
mm, concentrated in the October–March summer rainfall season (Hansen and Robb, 2017:11).
Midrand has undergone rapid commercial and residential densification over the past two decades
and functions as a key economic corridor between the Gauteng metros.
Exact location of Site A (3)
,Evaluation of site characteristics (6)
Topography: The site is predominantly flat, with a gentle slope (less than 3%) from northwest to
southeast. No significant rock outcrops or steep gradients are present.
Flora: The site falls within the Egoli Granite Grassland vegetation type, which is endemic to
Gauteng and regarded as the most sensitive vegetation type to urbanisation in the City of
Johannesburg (Hansen and Robb, 2017:36). However, the site has been previously disturbed by
informal grazing and historical clearing; remaining vegetation consists largely of pioneer grass
species (Hyparrhenia hirta, Eragrostis curvula) with scattered exotic invader plants. No Red Data
plant species were observed during the preliminary walkover, though a follow-up floristic
survey is recommended.
Fauna: The site offers limited habitat value. Small mammals (rodents), common reptile species,
and urban-adapted birds are likely present. No sensitive or protected faunal species were
recorded.
Hydrology: A non-perennial drainage line traverses the eastern boundary of the site. This
watercourse is tributary to the Jukskei River system. A 32-metre buffer is legally required under
the EIA Regulations (Hansen and Robb, 2017:36).
Geology and soils: The site is underlain by Witwatersrand quartzite and shale, with residual
granite-derived soils in places. The soils are moderately deep and well-drained.
1.2 Site B: Alternative Site – Soweto (Region D)
Geographical description of Soweto, City of Johannesburg (1)
Soweto is located approximately 20 km southwest of the Johannesburg central business district,
situated on the undulating Highveld plateau at an elevation of approximately 1,600–1,700 metres.
The area experiences the same subtropical highland climate as Midrand, with slightly greater
temperature extremes and similar summer rainfall patterns (Hansen and Robb, 2017:11). Soweto is
South Africa's largest historically Black urban complex and has experienced significant retail and
infrastructure investment in recent years, although unemployment and service-delivery backlogs
remain challenges in parts of the area.
Exact location of Site B (3)
, Evaluation of site characteristics (6)
Topography: The site is gently undulating, with slopes of 2–5% and a slight depression in the
central portion where surface water collects during summer rains.
Flora: The site is dominated by disturbed grassland with Cynodon dactylon and Hyparrhenia
hirta. A small patch of what appears to be remnant Egoli Granite Grassland occurs along the
southern boundary. This vegetation type is a conservation priority in the City of Johannesburg
(Hansen and Robb, 2017:36).
Fauna: Similar to Site A, the faunal diversity is low. However, the adjacent undeveloped corridor
to the south may serve as a movement path for small mammals and reptiles.
Hydrology: A tributary of the Klip River runs approximately 200 m east of the site. No
watercourse traverses the site itself, reducing the regulatory complexity associated with
water-use licensing.
Geology and soils: The site is underlain by quartzite of the Witwatersrand Supergroup, with
shallow, rocky soils in places. Excavation costs may be higher than at Site A.
1.3 Comparison of Sites and the No-Go Alternative (2)
Criterion Site A (Midrand) Site B (Soweto)
Excellent – direct access to N1 and arterial Moderate – reliant on R558 and local
Accessibility
roads roads
Environmental Moderate – drainage line present, Moderate–high – remnant Egoli Granite
sensitivity disturbed grassland Grassland
Bulk services capacity High – existing commercial infrastructure Limited – requires service upgrades
Socio-economic need Lower – already well-served retail Higher – addresses retail undersupply
Construction
Lower – flat terrain, less rock Higher – shallow rock, localised wetland
complexity
The no-go alternative would result in no development on either site. While this would preserve the
existing (largely disturbed) vegetation and avoid construction-phase impacts, it would forgo the
economic and social benefits of a regional retail facility, including an estimated 1,200 construction
jobs and 800 permanent jobs. Given the City of Johannesburg's Spatial Development Framework
2040 emphasis on densification and economic node development, the no-go alternative is not
considered desirable (Hansen and Robb, 2017:24).