100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4,6 TrustPilot
logo-home
Exam (elaborations)

CISEC Exam || 100% Error-free Answers.

Rating
-
Sold
-
Pages
5
Grade
A+
Uploaded on
25-01-2026
Written in
2025/2026

CISEC Exam || 100% Error-free Answers.

Institution
CISEC
Course
CISEC









Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
CISEC
Course
CISEC

Document information

Uploaded on
January 25, 2026
Number of pages
5
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

CISEC Exam || 100% Error-free Answers.
Stormwater control design goal correct answers Minimize the discharge of pollutants in
stormwater.

SW control design factors correct answers Expected amount and frequency of precipitation, soil
type and range, flow from impervious surfaces, slopes, and BMPs to control flow rates.

Erosion and sediment control requirements correct answers Provide and maintain natural buffers
and/or equivalent erosion and sediment controls for discharges to any receiving waters located
within 50 feet of the site's earth disturbances.

Directing stormwater correct answers Towards vegetated areas, maximize infiltration and
filtering to minimize pollutant discharges unless unadvisable due to geological factors (GW
contamination, karst geography, etc.)

Installing perimeter controls correct answers Must be installed upgradient of any natural buffers,
extend on the contour of a slope with ends curved upwards.

Maintaining perimeter controls correct answers Remove sediment before it has accumulated to
1/2 the height of the control, and if it is ineffective following a precipitation event: extend or
repair controls.

Minimizing sediment track-out correct answers Restricting vehicle use to designated points and
installing tracking controls like wheel washing, rumble plates, and 3-inch gravel.

Managing stockpiles correct answers Away from inlets or concentrated flow areas, install a
sediment barrier along downgradient areas, and if unused for 14+ days provide cover.

Minimizing dust correct answers On areas of exposed soil, apply water or other suppression
techniques.

Soil health factors correct answers Minimize steep slope disturbances, preserve native topsoil
unless infeasible, and minimize soil compaction.

Inlet protection correct answers Install protection measures that remove sediment from
discharges prior to entry (not required for sites with a sediment trap system); and clean or replace
protections as sediment accumulates.

Chemical use and storage correct answers Must be appropriately suited for soil type and treated
discharges. Must be stored in leak-proof containers under storm-resistant covers and surrounded
by secondary containment.

Exposed soil correct answers Must be stabilized and resistant to erosion.
Timeline:

, 5 acres or less--begin stabilizing where activity stops permanently or for more than 14 days
immediately, no more than 14 days.
More than 5 acres--begin stabilizing where activity stops permanently or for more than 14 days
immediately, no more than 7 days.

Turbidity monitoring--dewatering correct answers Must collect a sample from dewatering
discharge each day a discharge occurs, and after it has been treated.

Turbidity benchmark correct answers 50 NTUs

Inspection frequency correct answers At least once every 7 days; or once every 14 days AND
within 24 hours of a storm event that produces 0.25 inches or more precipitation in a 24 hour
period.

General inspection requirements correct answers - Check whether all stormwater controls are
properly installed and working as intended.
- Check for the presence of conditions that could lead to spills, leaks, or other accumulations of
pollutants in the site.
- Identify any locations where new or modified stormwater controls are necessary.
- Check for visual sedimentation and erosion at points of discharge.

Corrective action correct answers Triggered when:
- A stormwater control needs a significant repair or replacement.
- A stormwater control necessary to comply with the permit was improperly or never installed.
- Discharges are not meeting water quality standards.
- Contamination is evident.
- Etc.

Parts of SWPPP correct answers Stormwater team, nature of construction activities, site map,
non-stormwater discharges, description of stormwater controls, procedures for inspection
maintenance and corrective action, procedures for turbidity monitoring from dewatering,
compliance with other requirements (endangered species, historic sites, EPA water stuff, etc.).

Arid areas correct answers Areas with average annual rainfall of 0-10 inches.

CWA correct answers Clean Water Act, or federal water pollution control act.

Dewatering correct answers The act of draining accumulated storm/ground water from building
foundations, vaults, trenches, etc.

Discharge point correct answers The location where collected and concentrated stormwater flows
or dewatering water are discharged from the construction site.

Exposed soils correct answers Soils that as a result of earth-disturbing activities are left open to
the elements.

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
SirAnton NURSING, ECONOMICS, MATHEMATICS, BIOLOGY, AND HISTORY MATERIALS BEST TUTORING, HOMEWORK HELP, EXAMS, TESTS, AND STUDY GUIDE MATERIALS WITH GUARANTEED A+ I am a dedicated medical practitioner with diverse knowledge in matters
Follow You need to be logged in order to follow users or courses
Sold
737
Member since
3 year
Number of followers
437
Documents
34900
Last sold
1 week ago
Reign Supreme Scholarly || Enlightened.

Here we offer revised study materials to elevate your educational outcomes. We have verified learning materials (Research, Exams Questions and answers, Assignments, notes etc) for different courses guaranteed to boost your academic results. We are dedicated to offering you the best services and you are encouraged to inquire further assistance from our end if need be. Having a wide knowledge in Nursing, trust us to take care of your Academic materials and your remaining duty will just be to Excel. Remember to give us a review, it is key for us to understand our clients satisfaction. We highly appreciate clients who always come back for more of the study content we offer, you are extremely valued. All the best.

Read more Read less
3,7

110 reviews

5
46
4
20
3
22
2
8
1
14

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their exams and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can immediately select a different document that better matches what you need.

Pay how you prefer, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card or EFT and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions