U3 ICC
TESTING
TANK
U3TIGHTNESS
ICC
EXAMTANK
QUESTIONS
TIGHTNESS
TESTING
AND
EXAM
TESTING
ANSWERS
QUESTIONS
EXAM
LATEST
QUESTIONS
ANDUPDATE
ANSWERS
AND
2024
LATEST
ANSWERS
WITH VERIFIED
UPDATE
LATEST2024
ANSWERS.pdfA+
UPDATE
WITH VERIFIED
2024 WITH
ratedANSWERS.pdf
VERIFIED
verified content
ANSWERS
exam elaborations
U3 ICC TANK TIGHTNESS TESTING EXAM
QUESTIONS AND ANSWERS LATEST UPDATE
2024 WITH VERIFIED ANSWERS
On a steel tank without cathodic protection, if a coating is flawed, what happens at the flaw?
a. Cathodic surface is increased
b. Current flow is increased from this area
c. Current flow is increased to this area
b. Current flow is increased from this area
On an impressed current cathodic protection system, the negative wire of the rectifier is connected to
the:
a. Anode
b. Cathode
c. Drop tube
d. Dielectric union
b. Cathode
U3 ICC TANK
U3 ICC
TIGHTNESS
TANK TIGHTNESS
TESTING EXAM
TESTING
QUESTIONS
EXAM QUESTIONS
AND ANSWERS
AND ANSWERS
LATEST UPDATE
LATEST2024
UPDATE
19/01/2026
WITH2024
VERIFIED
A+
WITH
rated
VERIFIED
ANSWERS.pdf
verified content
ANSWERS.pdf
exam elaborations
,K TIGHTNESS
U3 ICC
TESTING
TANK
U3TIGHTNESS
ICC
EXAMTANK
QUESTIONS
TIGHTNESS
TESTING
AND
EXAM
TESTING
ANSWERS
QUESTIONS
EXAM
LATEST
QUESTIONS
ANDUPDATE
ANSWERS
AND
2024
LATEST
ANSWERS
WITH VERIFIED
UPDATE
LATEST2024
ANSWERS.pdfA+
UPDATE
WITH VERIFIED
2024 WITH
ratedANSWERS.pdf
VERIFIED
verified content
ANSWERS
exam elaborations
All are examples of acceptable release detection for tanks, except:
a. Impressed current cathodic protection
b. Automatic tank gauging
c. Statistical inventory reconciliation
d. Soil-vapor monitoring
a. Impressed current cathodic protection
When a tank is temporarily closed, the cathodic protection system:
a. Must be turned off
b. Must remain in operation
c. Should be removed
d. Operator can have it on or off.
b. Must remain in operation
When a steel tank is installed with a galvanic CP system attached, the tank gauges are usually connected
through a riser with a dielectric bushing. What is the purpose of that?
a. To prevent static discharge
b. To minimize effects of noise
c. To electrically isolate the tank from the tank gauge
d. To prevent water intrusion in the tank
c. To electrically isolate the tank from the tank gauge
Factory-installed diectric coatings may include all of the following except:
U3 ICC TANK
U3 ICC
TIGHTNESS
TANK TIGHTNESS
TESTING EXAM
TESTING
QUESTIONS
EXAM QUESTIONS
AND ANSWERS
AND ANSWERS
LATEST UPDATE
LATEST2024
UPDATE
19/01/2026
WITH2024
VERIFIED
A+
WITH
rated
VERIFIED
ANSWERS.pdf
verified content
ANSWERS.pdf
exam elaborations
,K TIGHTNESS
U3 ICC
TESTING
TANK
U3TIGHTNESS
ICC
EXAMTANK
QUESTIONS
TIGHTNESS
TESTING
AND
EXAM
TESTING
ANSWERS
QUESTIONS
EXAM
LATEST
QUESTIONS
ANDUPDATE
ANSWERS
AND
2024
LATEST
ANSWERS
WITH VERIFIED
UPDATE
LATEST2024
ANSWERS.pdfA+
UPDATE
WITH VERIFIED
2024 WITH
ratedANSWERS.pdf
VERIFIED
verified content
ANSWERS
exam elaborations
a . Asphalt
b. epoxies
c. Enamels
d. fiberglass-reinforced plastic
a . Asphalt
According to the EPA, Tank tightness test data must be maintained for:
a. 18 months
b. 3 years
c. 5 years
d. Until the next test is performed
d. Until the next test is performed
How long must records of UST system repairs be available on site?
a. 60 days
b. 1 year
c. 5 years
d. for the remaining lifetime of the UST system
d. for the remaining lifetime of the UST system
In the event of a release, what is the reporting requirement?
a. ICC licensed supervisor must report the leak within 24 hours
b. Owner/Operator must report the leak within 24 hours
U3 ICC TANK
U3 ICC
TIGHTNESS
TANK TIGHTNESS
TESTING EXAM
TESTING
QUESTIONS
EXAM QUESTIONS
AND ANSWERS
AND ANSWERS
LATEST UPDATE
LATEST2024
UPDATE
19/01/2026
WITH2024
VERIFIED
A+
WITH
rated
VERIFIED
ANSWERS.pdf
verified content
ANSWERS.pdf
exam elaborations