SPēD SAPPC: INDUSEC Questions with
Correct Answers | Updated (100% Correct
Answers)
Scenario: When designing a new multi-story government Special
Access Program Facility (SAPF), the architect provided identical
drawings for two three-story buildings to the security officer. One
drawing is for a building on the installation to be occupied only by
contracting Company X. The other is for the command headquarters
building on the installation. The design reveals floor-to-ceiling
windows on the second floor for the main conference rooms and
front office staff. The drawings indicate a parking lot adjacent to the
building separated by a four-foot-wide, handicap-accessible
sidewalk. The architect placed emergency exits and stairwells at each
end of the building with door hardware on the exterior to facilitate
access/egress. The floor plans show interior office and conference
room doors with GSA-approved locks and connectivity to the
building access control badge system. The front door drawings
indicate a lar Answer: C. Either DSS or the host command
True or False. Contractors visiting the facility do not require check-in
at the front desk if they have a Common Access Card (CAC) because
other control measures will be in place throughout the facility.
Answer: False
© 2025 All rights reserved
, 2
Overall Responsibility for the security of the installation, law
enforcement, traffic regulations, physical security, info security,
personnel security, and info systems security Answer: Installation
Commander
Administration and day to day operations of the security program at
a cleared contractor 1) ensuring compliance with the NISP, 2)
Following NISPOM guidelines, 3) Additional FSO activities Answer:
Purpose of the NISP
Assigned to a specific contract and is the person who oversees the
process, making sure that all of the necessary requirements are
being met by the contracting officer Answer: Contracting Officer
Representative (COR)
A subject matter expert, who could potentially have a day to day
contract with a contractor, knowledge necessary to interact with the
contractor concerning the service to be provided to the government
Answer: Contracting Officer Technical Representative (COTR)
Employee of cognizant security officer, usually the DSS. The IS Rep
is a cleared contractors primary point of contact within the
government for security matters. Answer: Industrial Security
Representative
The government organization that provides advice, assistance and
oversight Answer: Cognizant Security Offices (CSO)
© 2025 All rights reserved