Unit 9 IT Project Management

PEARSON (PEARSON)

Here are the best resources to pass Unit 9 IT Project Management. Find Unit 9 IT Project Management study guides, notes, assignments, and much more.

All 137 results

Sort by

unit 9 IT project management assignment 2 and 3. ( all criteria met. Distinction.)  Popular
  • unit 9 IT project management assignment 2 and 3. ( all criteria met. Distinction.)

  • Essay • 24 pages • 2023
  • This document has achieved the 100% Distinction Criteria for IT project management assignment 2 and 3 combined.
    (2)
  • $7.06
  • 6x sold
  • + learn more
Part D - Assignment 3 (Unit 9: IT Project Management) (Distinction Achieved)
  • Part D - Assignment 3 (Unit 9: IT Project Management) (Distinction Achieved)

  • Essay • 2 pages • 2024
  • Available in package deal
  • This essay meets all of the criteria and achieved a distinction grade. To successfully fulfill this assignment, I recommend avoid direct replication of the provided content due to a chance of plagiarism. Instead, draw inspiration from the structure and concepts utilized to meet the specified criteria. Following Aims met in Assignment 3: - Learning Aim D: Undertake the closure of a project by reflecting on the success of personal performance and the project outcome Feel free to message f...
    (0)
  • $5.14
  • + learn more
Part BC - Assignment 2 (Unit 9: IT Project Management) (Distinction Achieved)
  • Part BC - Assignment 2 (Unit 9: IT Project Management) (Distinction Achieved)

  • Essay • 33 pages • 2024
  • Available in package deal
  • Part BC - Assignment 2 (Unit 9: IT Project Management) (Distinction Achieved) This essay meets all of the criteria and achieved a distinction grade. To successfully fulfill this assignment, I recommend avoid direct replication of the provided content due to a chance of plagiarism. Instead, draw inspiration from the structure and concepts utilized to meet the specified criteria. Following Aims met in Assignment 2: - Learning Aim B: Carry out a project initiation for an IT project - Lear...
    (0)
  • $12.87
  • + learn more
Part A - Assignment 1 (Unit 9: IT Project Management) (Distinction Achieved)
  • Part A - Assignment 1 (Unit 9: IT Project Management) (Distinction Achieved)

  • Essay • 17 pages • 2024
  • Available in package deal
  • Distinction Achieved. This essay covers ALL LEARNING AIMS for Unit 9 - IT Project Management Assignment 1. To successfully fulfill this assignment, avoid direct replication of the provided content. Instead, draw inspiration from the structure and concepts utilized to meet the specified criteria. Please feel free to message me about any inquires or support.
    (0)
  • $7.72
  • + learn more
Unit 9: IT Project Management Assignment 1 Distinction
  • Unit 9: IT Project Management Assignment 1 Distinction

  • Presentation • 20 pages • 2024
  • Unit 09 IT Project Management Assignment 1 All criteria met Distinction
    (0)
  • $18.67
  • + learn more
Unit 9 IT Project Management Specification
  • Unit 9 IT Project Management Specification

  • Summary • 14 pages • 2023
  • Unit 9 IT Project Management Specification This document goes through what needs to be done in order to get pass, merit & distinction for unit 9 IT Project Management.
    (0)
  • $7.72
  • + learn more
Unit 9 IT Project Management Assignment 1 ( Learning Aim A)
  • Unit 9 IT Project Management Assignment 1 ( Learning Aim A)

  • Other • 21 pages • 2023
  • This is a Distinction Work. it covers all the criteria and got a high level Distinction.
    (0)
  • $9.52
  • 1x sold
  • + learn more
Unit 9- IT Project Management
  • Unit 9- IT Project Management

  • Summary • 16 pages • 2023
  • unit 9
    (0)
  • $9.65
  • 1x sold
  • + learn more