100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

IMSA Traffic Signal Technician II EXAM STUDY GUIDE 2026/2027 ACCURATE QUESTIONS WITH CORRECT DETAILED ANSWERS || 100% GUARANTEED PASS <RECENT VERSION>

Rating
-
Sold
-
Pages
70
Grade
A+
Uploaded on
20-12-2025
Written in
2025/2026

IMSA Traffic Signal Technician II EXAM STUDY GUIDE 2026/2027 ACCURATE QUESTIONS WITH CORRECT DETAILED ANSWERS || 100% GUARANTEED PASS &lt;RECENT VERSION&gt; 1. In a TS2 cabinet, how many times can the MMU experience a "Port 1 Fail" in a 24 hour period before the fault is latched? - ANSWER 1 2. On a 2070 MMU monitor unit, how does the field tech program allowable phases? - ANSWER Remove diode on program card for allowable phases 3. On an MMU, is it possible to tape the reset button to prevent the traffic signal from going into flash? - ANSWER Yes, it by-passes the conflict feature and will not flash 4. On a NEMA CMU program card, how does the signal tech program allowable phases? - ANSWER Install copper jumpers and soldering them on the program card 5. According to best maintenance practices, how often should CMU/MMU be tested? - ANSWER Annually 6. The MMU indicates a RED-FAIL fault on phase 6. Why? - ANSWER The load switch/switch pack produces no outputs. 7. The purpose of the controller CVM (Controller Voltage Monitor) output is to allow the CMU/MMU to monitor the - ANSWER Controller health 8. When a Technician is recertifying the CMU/MMU at an intersection, what should the technician do to have the intersection exit flash? - ANSWER Replace the CMU/MMU with a newly tested unit 9. Absence of all colors on a load switch will be indicated by what fault on an MMU or MMU2? - ANSWER Red Fail 10. BIU - ANSWER bus interface unit 11. 8 Channel and 16 channel chassis, are supported 4 racks 4- 8 - 12 bays & 16 - channel configurations. - ANSWER TS-2 12. TS2 connectors are what connector? - ANSWER serial connectors 13. TS - 2 BIS interface reduces WHAT? - ANSWER the complexity of the controller cabinet and Hundreds of conductors 14. NTCIP - ANSWER the national transportation Communications for, intelligent protocol 15. NTCIP - ANSWER to accommodate subsystems and users OF (ITS) 16. SDLC - ANSWER synchronous data Link Communications 17. A (. ) fault, will stay until the monitor is reset - ANSWER a latching fault 18. a blank will return to its state once the power is restored to the system - ANSWER non latching fault 19. these are primary functions of phasing conflicts, absence of red on a phase and proper operating DC voltage. On what monitors? - ANSWER CMU & MMU 20. examples of unlatching and latching Faults Are - ANSWER low voltage, voltage drop, loss of 24 volt power supply. 21. load switches 1 through 6 - ANSWER 1. AC hot 2. ground, 3. red / don't walk output to indication 4. N/U 5. Yellow PED CRL /OUTPUT INDICATION 6. RED/ INPUT FROM CONTROLLER 22. Load switches 7-12 - ANSWER 7. Grn / output to indication 8. Y PED CRL / input to controller 9. 24 V 10. Grn Walk/ input to controller 11. AC NEUTRAL 12.NOT USED 23. The traffic field technician is responsible for performing what types of maintenance on signals? - ANSWER Preventive and Emergency 24. The single most important focus for the traffic signal field technician is? - ANSWER Safety 25. Three main categories of safety a traffic signal technician is responsible for? - ANSWER Safety of motorist and pedestrians His or her own personal safety Safety of public and personal property 26. Traffic signal field technicians perform several maintenance and repair functions above the ground and roadway typically using what two vehicles? - ANSWER Bucket Truck Aerial lift (platform truck) 27. While using a bucket truck or aerial lift what implement provides proper protection for the user? - ANSWER Protective Harness 28. What responsibilities (liability) does a Traffic signal technician have while involved in repair, testing or maintenance? - ANSWER Legal liability Dealing with the public 29. It is imperative that the traffic signal field technician maintain comprehensive what of all the steps taken during repair and maintenance of traffic signals? - ANSWER Documentation 30. What two instances are documentation required for a traffic signal field technician? - ANSWER Routine maintenance Emergency repair 31. Approved Product List - ANSWER Contractor need not provide submittals if using materials on this list, a certification must be provided instead. 32. Certification number - ANSWER Number given to a product that has been pre-approved. Often it must be permanently engraved or stenciled on the product. 33. Shop-Drawing Submittals - ANSWER Most items of a structural nature require this to be submitted and provide detailed information. Usually sealed by and engineer. 34. Factory Acceptance Testing - ANSWER Tests conducted at the equipment suppliers facility. 35. Stockpiled Materials - ANSWER Materials kept at the contractor's warehouse or yard. Partial payments may be granted. 36. Inspector recordkeeping responsibilities - ANSWER 1. Daily construction activities 2. Federal compliance forms 3. Testing result forms 4. Quantities installed 5. Photographs 6. Final inspection report

Show more Read less
Institution
IMSA Traffic Signal Technician
Course
IMSA Traffic Signal Technician











Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
IMSA Traffic Signal Technician
Course
IMSA Traffic Signal Technician

Document information

Uploaded on
December 20, 2025
Number of pages
70
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

IMSA Traffic Signal Technician II EXAM
STUDY GUIDE 2026/2027 ACCURATE
QUESTIONS WITH CORRECT DETAILED ANSWER
|| 100% GUARANTEED PASS
<RECENT VERSION>



1. In a TS2 cabinet, how many times can the MMU experience a "Port 1 Fail"
in a 24 hour period before
the fault is latched? - ANSWER ✔ 1


2. On a 2070 MMU monitor unit, how does the field tech program allowable
phases? - ANSWER ✔ Remove diode on program card for allowable phases


3. On an MMU, is it possible to tape the reset button to prevent the traffic
signal from going into flash? - ANSWER ✔ Yes, it by-passes the conflict
feature and will not flash


4. On a NEMA CMU program card, how does the signal tech program
allowable phases? - ANSWER ✔ Install copper jumpers and soldering them
on the program card


5. According to best maintenance practices, how often should CMU/MMU be
tested? - ANSWER ✔ Annually

,6. The MMU indicates a RED-FAIL fault on phase 6. Why? - ANSWER ✔
The load switch/switch pack produces no outputs.


7. The purpose of the controller CVM (Controller Voltage Monitor) output is
to allow the CMU/MMU to
monitor the - ANSWER ✔ Controller health


8. When a Technician is recertifying the CMU/MMU at an intersection, what
should the technician do to have the intersection exit flash? - ANSWER ✔
Replace the CMU/MMU with a newly tested unit


9. Absence of all colors on a load switch will be indicated by what fault on an
MMU or MMU2? - ANSWER ✔ Red Fail


10.BIU - ANSWER ✔ bus interface unit


11.8 Channel and 16 channel chassis, are supported 4 racks 4- 8 - 12 bays & 16
- channel configurations. - ANSWER ✔ TS-2


12.TS2 connectors are what connector? - ANSWER ✔ serial connectors


13.TS - 2 BIS interface reduces WHAT? - ANSWER ✔ the complexity of the
controller cabinet and Hundreds of conductors


14.NTCIP - ANSWER ✔ the national transportation Communications for,
intelligent protocol

,15.NTCIP - ANSWER ✔ to accommodate subsystems and users OF (ITS)


16.SDLC - ANSWER ✔ synchronous data Link Communications


17.A (. ) fault, will stay until the monitor is reset - ANSWER ✔ a latching fault


18.a blank will return to its state once the power is restored to the system -
ANSWER ✔ non latching fault


19.these are primary functions of phasing conflicts, absence of red on a phase
and proper operating DC voltage. On what monitors? - ANSWER ✔ CMU
& MMU


20.examples of unlatching and latching Faults Are - ANSWER ✔ low voltage,
voltage drop, loss of 24 volt power supply.


21.load switches 1 through 6 - ANSWER ✔ 1. AC hot
2. ground,
3. red / don't walk output to indication
4. N/U
5. Yellow PED CRL /OUTPUT INDICATION
6. RED/ INPUT FROM CONTROLLER


22.Load switches 7-12 - ANSWER ✔ 7. Grn / output to indication
8. Y PED CRL / input to controller
9. 24 V
10. Grn Walk/ input to controller
11. AC NEUTRAL
12.NOT USED

, 23.The traffic field technician is responsible for performing what types of
maintenance on signals? - ANSWER ✔ Preventive and Emergency


24.The single most important focus for the traffic signal field technician is? -
ANSWER ✔ Safety


25.Three main categories of safety a traffic signal technician is responsible for?
- ANSWER ✔ Safety of motorist and pedestrians
His or her own personal safety
Safety of public and personal property


26.Traffic signal field technicians perform several maintenance and repair
functions above the ground and roadway typically using what two vehicles?
- ANSWER ✔ Bucket Truck
Aerial lift (platform truck)


27.While using a bucket truck or aerial lift what implement provides proper
protection for the user? - ANSWER ✔ Protective Harness


28.What responsibilities (liability) does a Traffic signal technician have while
involved in repair, testing or maintenance? - ANSWER ✔ Legal liability
Dealing with the public


29.It is imperative that the traffic signal field technician maintain
comprehensive what of all the steps taken during repair and maintenance of
traffic signals? - ANSWER ✔ Documentation

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
ProfBenjamin Havard School
View profile
Follow You need to be logged in order to follow users or courses
Sold
417
Member since
1 year
Number of followers
14
Documents
2928
Last sold
7 hours ago
EXCELLENT ACHIEVERS LIBRARY

As a professional tutor, I provide exceptional assistance with homework, quizzes, and exams across various subjects, including Psychology, Nursing, Biological Sciences, Business, Engineering, Human Resource Management, and Mathematics. I am dedicated to offering high-quality support and ensuring that all work meets scholarly standards. To enhance the effectiveness of our services, I work with a team of experienced tutors to create comprehensive and effective revision materials. Together, we are committed to helping students achieve excellent grades through our collaborative efforts and expertise.

Read more Read less
3.9

77 reviews

5
35
4
12
3
22
2
4
1
4

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions