In accordance with the American public works association, uniform, color code for
utilities, what color is used to mark or flag gas lines? - answer>>>Yellow
The member utilities, or their contract locators have how many full working days to
respond to a design/survey ticket? - answer>>>10 working days
Any person who conducts an emergency repair, essential to protect human life, that
constitutes a land disturbing activity should notify the Director of such repair as soon
as possible, but no later than blank working days after the emergency ends. -
answer>>>5 days
Any increase over the rate of natural erosion, as a result of land, disturbing activities
is known as? - answer>>>Accelerated erosion
Provisions for ground cover, sufficient to restrain erosion must be done within blank
calendar days following completion of construction or development. - answer>>>90
calendar days
High Quality Water (HQW) zones means areas in the coastal counties that are within
blank feet of high quality waters. - answer>>>575 feet
Unless otherwise provided, the width of a buffer zone is measured from the edge of
the water to the nearest edge of the disturbed area, with the percent of the strip,
near the land, disturbing activity containing natural or artificial means of confining
visible siltation. - answer>>>25%
, -
Uncovered areas in HQW zones shall be limited to a maximum total area of blank
within the boundaries of the track. - answer>>>20 acres
What is the minimum width for an undisturbed buffer zone adjacent to designated
trout waters? - answer>>>25 foot width
And erosion and sediment control plan may be disapproved if the plan fails to
address the following control objectives, except? - answer>>>Control accelerated,
erosion
What is the term of surface runoff resulting from a rainfall of an intensity expected
to be equal or exceed the average intensity seen once in 10 years, and a duration,
which will produce the maximum peak rate of runoff, for the area under the average
prior conditions? - answer>>>10 year storm
The commission shall approve, approve with modifications, or disapprove, a draft
erosion and sediment control plan for those land disturbing activities when prior
approval is required within how many days of receipt? - answer>>>30 days
Who is responsible for performing an inspection of the area covered by the erosion
control plan after each phase of the plan has been completed? - answer>>>The
landowner or financially responsible party
No land disturbing activity during periods of construction of improvement to Leeann
shall be permitted in proximity to a lake or natural watercourse, unless a buffer zone
is provided along the margin of the watercourse, or sufficient with two can find
visible siltation within what percentage of the buffer zone nearest the land
disturbing activity? - answer>>>25%
QUESTIONS AND VERIFIED CORRECT ANSWERS
LATEST 2026-2027 NEW VERSION
In accordance with the American public works association, uniform, color code for
utilities, what color is used to mark or flag gas lines? - answer>>>Yellow
The member utilities, or their contract locators have how many full working days to
respond to a design/survey ticket? - answer>>>10 working days
Any person who conducts an emergency repair, essential to protect human life, that
constitutes a land disturbing activity should notify the Director of such repair as soon
as possible, but no later than blank working days after the emergency ends. -
answer>>>5 days
Any increase over the rate of natural erosion, as a result of land, disturbing activities
is known as? - answer>>>Accelerated erosion
Provisions for ground cover, sufficient to restrain erosion must be done within blank
calendar days following completion of construction or development. - answer>>>90
calendar days
High Quality Water (HQW) zones means areas in the coastal counties that are within
blank feet of high quality waters. - answer>>>575 feet
Unless otherwise provided, the width of a buffer zone is measured from the edge of
the water to the nearest edge of the disturbed area, with the percent of the strip,
near the land, disturbing activity containing natural or artificial means of confining
visible siltation. - answer>>>25%
, -
Uncovered areas in HQW zones shall be limited to a maximum total area of blank
within the boundaries of the track. - answer>>>20 acres
What is the minimum width for an undisturbed buffer zone adjacent to designated
trout waters? - answer>>>25 foot width
And erosion and sediment control plan may be disapproved if the plan fails to
address the following control objectives, except? - answer>>>Control accelerated,
erosion
What is the term of surface runoff resulting from a rainfall of an intensity expected
to be equal or exceed the average intensity seen once in 10 years, and a duration,
which will produce the maximum peak rate of runoff, for the area under the average
prior conditions? - answer>>>10 year storm
The commission shall approve, approve with modifications, or disapprove, a draft
erosion and sediment control plan for those land disturbing activities when prior
approval is required within how many days of receipt? - answer>>>30 days
Who is responsible for performing an inspection of the area covered by the erosion
control plan after each phase of the plan has been completed? - answer>>>The
landowner or financially responsible party
No land disturbing activity during periods of construction of improvement to Leeann
shall be permitted in proximity to a lake or natural watercourse, unless a buffer zone
is provided along the margin of the watercourse, or sufficient with two can find
visible siltation within what percentage of the buffer zone nearest the land
disturbing activity? - answer>>>25%