100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

Walmart SWPPP Exam Questions and Answers Graded A+

Rating
-
Sold
-
Pages
7
Grade
A+
Uploaded on
08-12-2025
Written in
2025/2026

Walmart SWPPP Exam Questions and Answers Graded A+

Institution
NSG 6005
Course
NSG 6005









Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
NSG 6005
Course
NSG 6005

Document information

Uploaded on
December 8, 2025
Number of pages
7
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

Walmart SWPPP Exam Questions and
Answers Graded A+

Clean Water Act - Correct answer-1970s law that set into place the regulation of

stormwater

NPDES - Correct answer-Requirements for managing stormwater activity on a

construction site are outlined in the following regulation

Immediately after the project award and before the general contractor begins any

site work - Correct answer-Onsite stormwater pollution prevention plan (SWPPP)

binder should be put together by the general contractor

Flushing a spill down the storm drain - Correct answer-Which of the following is

not a beneficial use of water

Discharge from contaminated ground water - Correct answer-Which of the

following is never an allowable stormwater discharge from a construction site.

All construction activity, inside and outside the building is complete and permanent

stabilization has been verified is adequate to meet permit requirements - Correct

answer-The notice of termination (NOT) can be filed when

, All of the above - Correct answer-You should have a SWPPP for construction

because

Site Specific - Correct answer-A well designed SWPPP should be

After the SWPPP is prepared and before starting construction - Correct answer-The

stormwater notice of intent (NOI) must be submitted

All of the above - Correct answer-Potential pollutant sources stored on a

construction site may include

Seek written approval from the project SWPPP designer and, if required, the

project owner - Correct answer-If you believe stormwater BMP modifications are

necessary, you must

The SWPPP Certification Letter - Correct answer-The document is in the SWPPP

that certifies a general contractors commitment to compliance with the SWPPP is

Protects the site by coordinating timing with construction activities and minimizing

pollutant exposure - Correct answer-Sequencing and scheduling BMP installation

Account for the time it takes to install and/or implement BMPs between each phase

of construction - Correct answer-Factors to consider when creating your schedule

include

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
EmillyCharlotte Howard Community College
View profile
Follow You need to be logged in order to follow users or courses
Sold
95
Member since
1 year
Number of followers
4
Documents
11950
Last sold
1 day ago
ALL-MAJOR.

On this page, you find all documents, package deals, and flashcards offered by seller Emilly Charlotte.

3.6

20 reviews

5
7
4
6
3
2
2
2
1
3

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions