100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

CALIFORNIA BRANCH 3 (Inspection reports & recommendations)NEWEST 2026/2027 ACTUAL EXAM COMPLETE QUESTIONS AND CORRECT DETAILED ANSWERS (VERIFIED ANSWERS) |ALREADY GRADED A+||BRAND NEW!!

Rating
-
Sold
-
Pages
2
Grade
A+
Uploaded on
30-11-2025
Written in
2025/2026

CALIFORNIA BRANCH 3 (Inspection reports & recommendations)NEWEST 2026/2027 ACTUAL EXAM COMPLETE QUESTIONS AND CORRECT DETAILED ANSWERS (VERIFIED ANSWERS) |ALREADY GRADED A+||BRAND NEW!!

Institution
CA BRANCH 3
Course
CA BRANCH 3








Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
CA BRANCH 3
Course
CA BRANCH 3

Document information

Uploaded on
November 30, 2025
Number of pages
2
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

CALIFORNIA BRANCH 3 (Inspection
reports & recommendations)

After four months from authentic inspections - ANS-ALL re-inspections will be ORIGINAL

all REPORTS and WORKSHEETS - ANS-MUST be kept for 3 years

cellulose particles - ANS-MUST be advocated to be removed if large than rakeable length

of completion tag - ANS-posted next to inspection tag while work is completed

failure to report - ANS-may want to result in disciplinary movement AND pleasant up to $2500

FILING FEE - ANS-$1.50 in line with cope with

if LIMITED REPORT is made - ANS-it need to country the call of person or agent soliciting for a
limited record

if SPCB requests record - ANS-you've got 2 days to put up!

INSPECTION or COMPLETION - ANS-MUST be filed with the board WITHIN 10 DAYS!!

Inspection tag - ANS-3x5
posted in attic, garage or subarea for ALL wdo inspections

LIMITED REPORT - ANS--can be made on a given area of the shape
-ought to specify what unique area changed into covered

ought to be unique as a limited document if... - ANS-only a part of the constructing inspected

notice of work finished and now not finished - ANS-shall be given to proprietor or proprietor's
agent within 10 WORKING DAYS after finishing work beneath the contract. (form is prescribed
by using board)

PROPER ACCEPTABLE CLEARANCE - ANS-12 inches from soil to joist

re-inspection - ANS-may be requested(of the same organization) up to four months after unique
inspection
-can be refused if owner of a house has made upkeep without building allows

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
TutorHub Teachme2-tutor
View profile
Follow You need to be logged in order to follow users or courses
Sold
82
Member since
1 year
Number of followers
8
Documents
2105
Last sold
3 weeks ago

Welcome to Tutorhub ! The place to find the best study materials for various subjects. You can be assured that you will receive only the best which will help you to ace your exams. All the materials posted are A+ Graded. Please rate and write a review after using my materials. Your reviews will motivate me to add more materials. Thank you very much!

4.5

30 reviews

5
22
4
3
3
3
2
1
1
1

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions