COSC 275 Exam Questions and Answers
Graded A+
OCEW - Correct answer-On center each way
CSI - Correct answer-Construction specification institute
NIC - Correct answer-Not in contract
UNO - Correct answer-Unless noted otherwise
FF - Correct answer-Finish Floor
EWH - Correct answer-Electric waterheater
WC - Correct answer-Water closet (toilet)
Civil Plan - Correct answer-a profile plan
If GC doesn't perform work, why is there a take off practice? - Correct answer-GC
is responsible; needs to know whats going on
3'-00"x 4'-00" - Correct answer-4'-00" is the height
Why is there take off for sprandel glass in addition to normal glass - Correct
answer-it is something that costs significantly more than the normal glass
©COPYRIGHT 2025, ALL RIGHTS RESERVED 1
Graded A+
OCEW - Correct answer-On center each way
CSI - Correct answer-Construction specification institute
NIC - Correct answer-Not in contract
UNO - Correct answer-Unless noted otherwise
FF - Correct answer-Finish Floor
EWH - Correct answer-Electric waterheater
WC - Correct answer-Water closet (toilet)
Civil Plan - Correct answer-a profile plan
If GC doesn't perform work, why is there a take off practice? - Correct answer-GC
is responsible; needs to know whats going on
3'-00"x 4'-00" - Correct answer-4'-00" is the height
Why is there take off for sprandel glass in addition to normal glass - Correct
answer-it is something that costs significantly more than the normal glass